My WebLink
|
Help
|
About
|
Sign Out
10 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
10 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2008 3:27:56 PM
Creation date
3/13/2008 3:27:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
10 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TJ[91A <br /># Ton February 21, 2008 <br />~_,%' G'OIIWhOrlb PAgE 1 <br />Detailed Scope for updating TJKM's old Traffic Signal Modification Design Plans at the <br />Intersection of Vineyard Avenue and Bernal Avenue in the City of Pleasanton <br />Project Definition/Conceptual Design <br />~ Attend one meeting with City staff to confirm conceptual design parameters <br />~ Obtain available information such as as-built drawings and aerial in ACAD format and <br />standard provisions from the civil <br />~ Obtain available information on existing utilities such as sewer, water, and storm drain <br />from the civil <br />~ Obtain contact information for existing underground and overhead utilities from the civil <br />4 Obtain base plans including proposed improvements in ACRD format from the civil <br />~ Conduct field review of site, including verification of existing layout of signing and <br />pavement markings and utilities <br />Prepare Plans and Specifications <br />~ Prepare detailed traffic designs in AutoCAD format <br />~ Designs are in accordance with Caltrans Standard Plans and Specifications, and City <br />Standards <br />~ City to prepare Special Provisions <br />4 Prepare design review submittals for 90% review and 100% review (see additional services <br />~:. for additional review submittals) <br />Final Design <br />4 Revise plans to incorporate review agency's commerrts <br />~ Submit final plans, specifications, and estimate <br />Bidding and Construction Support Services <br />4 Answer telephone inquiries by bidders <br />~ Provide one set of reproducible drawings <br />~ Attend one pre-construction meeting <br />Additional Services <br />TJKM is available to perform additional services as requested by the Client, These services may be <br />included, but are not limited to: <br />~ Attendance at additional meetings <br />4 Traffic analysis for lane configuration and signal phasing <br />~ Street lighting design/modiflcation <br />~ Attendance at signal turn-on <br />4 Changes to plans after final plans (Mylar's) have been submitted and signed by the City <br />4 Additional review submittals (more than 3 review submittals) <br />4 Additional work outside the signal installation (CCTV, fiber optic) <br />The fee and schedule for these services will be determined of the time the services ore requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.