Laserfiche WebLink
PAR 1 K H Geotechnical ^ <br />Environmental ^ <br />Materials Testing ^ <br />Construction Inspection ^ <br />Prac#icing in the Geosciences <br />2008 FEE SCHEDULE <br />EFFKTIVE THROUGH DKEMBER 2008 <br />Project Manager/Principal $200/hour <br />Senior Engineer/Geologist $175/hour <br />Project Engineer/Geologist $145/hour <br />Contract Management $130/hour <br />Field Engineer/Geologist $90/hour <br />Staff Engineer/Geologist $90/hour <br />Senior Lab Technician $90/hour <br />Lab Technician/Field Technician $90/hour <br />~~~°A $70/hour <br />Nuclear Gauge ($S/test, $35/day or $600/month) $5/~ <br />Legal Consultation Quote <br />Expert Witness Quote <br />Construction Phase: All time spent over $ hours per day and Saturdays for field personnel <br />wiD be charged at 1.5 times the hourly rate. Sunday work will be charged at twice the <br />hourly rate. All charges are portal-to-portaI and mileage will be <br />charged at 48.5 cents per <br />mile. Field tame, including travel time, will be charged in a hour increment. Any <br />chargeable time that falls in between these increments will be charged at the rate of the next <br />hour increment. <br />OUTSIDE SERVICES <br />Drilling rental of special equipment and other outside charges will be invoiced at cost plus <br />15%. Direct contracting/billing and payment will not incur these costs. Outside services, <br />beyond those included an the proposal, will not be performed without prior authorization <br />from the Client. <br />1Vliscellaneous outside reimbursable expenses encountered during the performance of our <br />work, such as printing and other incidentals, will be billed at cost plus 15°6. <br />The hourly rates indicated above shall remain in effect for the term of the Agreement, unless <br />adjustments are approved in writing, in advance of accruing cost at new rates, by the Client. <br />Main Office: 356 S. Milpitas Blvd., Milpitas, CA 95035-5421. (408)945-1011 • FAX (408) 945-1012 . www.PARIKHNET.com <br />