My WebLink
|
Help
|
About
|
Sign Out
10 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
10 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2008 3:27:56 PM
Creation date
3/13/2008 3:27:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
10 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Biggs Cardcaa Associate <br />PR No: 200122.CON <br />February 22, 2008 <br />Page 2 <br />3. Pile Driviny~Observation. <br />Pile driving observation is required for the spread footings at bents and abutment footings. <br />As per the plans there are spread footings at the bents, 14 piles at Abutment 1 and 18 piles at <br />Abutment 5. We have assumed that 2 days per abutment will be required for the pile driving <br />for a total of 4 days. In addition footing observation for the bent footings will be 2-4 hours <br />per bent for 4 bents. It is possible that longer than 8-hour day may be required to accomplish <br />some of the pile driving work. <br />The above discussed services are to be provided in accordance with our standard rate schedule <br />and terms and conditions and will be dependant upon the construction program and schedule. <br />These services will be provided to the City's Resident Engineer on an on-call basis as our <br />personnel will not be at the site on a daily basis. This will have to be closely coordinated by the <br />Construction Managers for the project. <br />Our charges will be based on the standard fee schedule. <br />1) Compaction Testing 5 days x 8 hrs x $90/hr .......................................... $ 3,600.00 <br />2 Compaction Curves - ASTM D-1557 at $200 each ............................... $ 400.00 <br />Mileage 40 x S days ~ $0.485/mi ...................................................... $ 97.00 <br />2) Construction support services -consultation RFI etc <br />Project Engineer 16 hrs x $145/hr (est.) ............................................... $ 2,320.00 <br />Project Manager 10 hrs. x $200/hr (est.) .............................................. $ 2,000.00 <br />3) Pile Driving Observation <br />Pile observation 4 days x 9 hrs x $90/hr ............................................... $ 3,240.00 <br />Mileage 40 x 4 days ~ $0.485/mi ................... ............. $ 77.60 <br />...................... <br />Bent footing observation 4 x 4 hrs x $90/hr ........................................... $ 1,440.00 <br />Mileage 40 x 4 days C9~ $0.485/rni ...................................................... $ 77.60 <br />4) Project Coordination and oversight: <br />Project Engineer 16 hrs x $145/hr (est.) ............................................... $ 2,320.00 <br />Project Manager 10 hrs. x $200/hr (est) ............................................... 2000.00 <br />Total Estimate $17,57Z.Z0 <br />This estimate is based on the assumed project schedule and the information provided by your <br />office. The actual costs could be lower or higher than the estimate depending upon the requested <br />services and contractor's schedule. Therefore, a contingency is highly reconvnended to reduce a <br />potential for supplemental budget requests. Our services will be provided in accordance with our <br />fee schedule on a time and materials basis. <br />/° <br />
The URL can be used to link to this page
Your browser does not support the video tag.