My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
030408
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2008 9:57:33 AM
Creation date
2/29/2008 9:03:23 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/4/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br />CONTRACT <br />TRAFFIC SIGNAL INSTALLATION AT THE INTERSECTION OF BERNAL <br />AVENUE AND I-680 FREEWAY S/B OFF-RAMP (CIP# 005068) AND <br />COMPLETION OF THE TRAFFIC SIGNAL SYSTEM AT VINEYARD AVENUE <br />AND PIETRONAVE LANE (CIP# 075014) <br />THIS CONTRACT is made and entered into this 4th day of March 2008 by and <br />between John D. Baker Construction Co., ("Contractor"), whose address is 7500 West <br />Lane, Suite 109, Stockton, CA. 95210, and telephone number is (209) 475-9705, and the <br />CITY OF PLEASANTON, a municipal corporation ("City"). <br />WITNESSETH: <br />WHEREAS, the City has awarded to the Contractor a contract for the Traffic <br />Signal Installation at the Intersection of Bernal Avenue and I-680 Freeway southbound <br />off-ramp (CIP No.005068) and Completion of the Traffic Signal System at Vineyard <br />Avenue and Pietronave Lane (CIP No.075014) <br />NOW, THEREFORE, in consideration of the mutual promises set forth herein, <br />the parties agree as follows: <br />Work to be Performed. <br />The work shall consists of furnishing and installing all required traffic signal <br />controllers and cabinets, street lights, traffic signal poles and mast arms, Edge-lit <br />LED street name signs, Intelligent Transportation Systems related devices, <br />conduits, conductors, foundations, pedestrian and equestrian push button poles <br />and equipments, pull boxes, antenna, loop detectors, signal interconnect cables, <br />luminaires, bollards, EVA gates, video detection equipments, testing of <br />equipments, traffic striping, pavement markings, signing and providing all <br />necessary equipment brochures and manuals. <br />Said work is more particularly shown in the following documents which are on <br />file with the Department of Public Works of the City and are incorporated herein <br />by this reference: <br />A. Plans and Specifications entitled the Traffic Signal Installation at <br />the Intersection of Bernal Avenue and I-680 Freeway southbound <br />off-ramp (CIP#005068) and Completion of the Traffic Signal <br />System at Vineyard Avenue and Pietronave Lane (CIP#075014), <br />and addenda thereto, if any. <br />B. Contract Change Orders approved by the City Engineer, done in <br />accordance with the Standard Specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.