My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
021908
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2008 4:50:03 PM
Creation date
2/13/2008 4:43:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment C -Preliminary Drawing List <br />The City of Pleasanton <br />Wastewater Pump Station S-6 -Project No. 012027 <br />Sheet No. thug. No• Description <br />GENERAL <br />1 G -1 Cover Sheet -Project Location and Drawing List <br /> TYPICALS <br />2 T -1 Typical Details -General <br />3 T -2 Typical Details -Civil <br />4 T -3 Typical Details - Electripl <br />5 T -0 Typical Details -Electrical <br />6 T -5 Typical Details -Mechanical <br />7 T -6 Typical Details -Mechanical <br />8 T -7 Typical Details -Structural <br />9 T -8 Typical Details -Structural <br /> DEMOLITION <br />10 D -1 Site Plan <br />11 D -2 Photos <br />12 C -1 Site Plan -Yard Piping <br />13 C -2 Site Plan -Paving 8 Grading <br />CIVIL <br />ARCHITECTURAL <br />14 A -1 Control Building Elevations <br />15 A -2 Details <br /> STRUCTURALIMECHANICAL <br />16 S •1 Control Building -Ground Level Plan & Roof Plan <br />17 S -2 Control Building -Sections <br />18 S -3 Pump Station -Plans <br />19 S -4 Pump Station -Sections <br />20 S -5 Details <br /> ELECTRICAL <br />21 E -1 Electrical Legend <br />22 E -2 Electrical Site Plan <br />23 E -3 Single Line Diagrams <br />24 E -4 Panel Schedules /Lighting Schedule <br />25 E -5 Control Schematics <br />26 E -6 Control Schematics <br />27 E -7 Control Building -Power & Control Plan <br />28 E -8 Control Building -Lighting & Fire Alarm Plan <br />29 E -9 Temporary Single Line Diagram <br /> INSTRUMENTATION <br />30 I -1 Instrumentation Legend <br />31 I -2 Instrumentation Details <br />32 I -3 SCADA Block Diagram /PLC Panel Elevation <br />33 I -0 P81D <br />
The URL can be used to link to this page
Your browser does not support the video tag.