My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
021908
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2008 4:49:09 PM
Creation date
2/13/2008 4:33:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on the long-term need for expanded school facilities to serve new development in <br />Pleasanton. The method and manner for the provision of these funds and/or <br />facilities shall be approved by the City and in place prior to issuance of building <br />permits. In no event shall construction commence unless the above method and <br />manner for the provision of these funds and/or facilities has been approved by <br />the City. <br />32. All conditions of approval for this case shall be reprinted and included as a plan <br />sheet(s) with the building permit plan check sets submitted for review and <br />approval. These conditions of approval shall be on, at all times, all grading and <br />construction plans kept on the project site. <br />33. Prior approval from the Planning Department must be received before any <br />changes are constituted in site design, grading, building design, building colors or <br />materials, landscape material, etc. <br />34. A construction trailer may be placed on the project site for daily <br />administration/coordination purposes during the construction period. At no time <br />shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles, if any, shall be <br />removed from the site at the end of each workday. <br />35. The approved building materials and colors shall be stated on the building permit <br />plans to the satisfaction of the Planning Director. Substitutions shall not be <br />allowed unless otherwise approved by the Planning Director. <br />36. All site improvements and house construction activities shall be limited to the <br />hours of 5:00 a.m. to 5:00 p.m., Monday through Friday, excluding Federal <br />holidays. All construction equipment must meet Department of Motor Vehicles <br />(DMV) noise standards and shall be equipped with muffling devices. The <br />Planning Director may allow earlier "start-times" for specific construction activities <br />(e.g., concrete-foundation/floor pouring), if it can be demonstrated to the <br />satisfaction of the Planning Director that the construction noise and traffic will not <br />affect nearby residents. <br />Building Conditions <br />37. The project developer shall obtain a building permit from the Building and Safety <br />Division and any other applicable City permits for the project prior to the <br />commencement of any construction. <br />38. The project developer shall pay any and all fees to which the project may be <br />subject to prior to issuance of a building permit. The type and amount of the fees <br />shall be those in effect at the time the building permit is issued. <br />39. The applicant shall pay $2,500 toward the construction of facilities in the Bernal <br />Sports Park. The applicant shall pay the fee at the time of issuance of the first <br />building permit for either the existing structure or any of the new structures. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.