My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
021908
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2008 4:49:09 PM
Creation date
2/13/2008 4:33:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. All condensing units shall have the lowest noise rating. The location shall be <br />reviewed and approved by the Planning Director prior to building permit <br />issuance. The applicant may be required to install attic mounted HVAC units in <br />order to maintain clear garage floor area. <br />14. The chain link fence shall be removed and replaced with picket style fencing not <br />to exceed 42 inches in height and is subject to review and approval by the <br />Planning Director prior to issuance of a building permit. <br />15. In order to meet the stormwater (C3) requirements, the paver bands may have to <br />be widened and/or relocated and are subject to review and approval by the <br />Planning Director and the City Engineer prior to issuance of a building permit. <br />16. All new homes and the renovated existing home are required to be a "green <br />home". Prior to building permit submittal, a list of the green building measures <br />used in the design of the new homes and renovation of the existing home <br />covered by this approval shall be provided to the Planning Department for the <br />review and approval by the Planning Director. The homes covered by this <br />approval shall be designed to achieve a "certified rating" of a minimum of 50 total <br />points, with achieving the minimum points in each category, using Build It <br />Green's 2007 GreenPoints rating system. The green building measures shall be <br />shown on one of the first two pages of the plans submitted for issuance of a <br />building permit. Each point identified shall have a notation showing which <br />sheet the item can be found and each sheet shall note where the point is <br />located. All proposed green building measures shall be shown throughout the <br />plan set, as appropriate, as determined by the Planning Director and the Chief <br />Building Official. A special inspection by a representative from the Planning <br />Department shall be coordinated with regards to landscaping, irrigation, and <br />exterior materials. All of the green building measures indicated on the approved <br />checklist shall be inspected and approved by either the City of Pleasanton, a <br />qualified specialist, or the applicant shall provide written verification by the project <br />engineer, architect, landscape architect, or designer. <br />17. All residences in the PUD shall be constructed to allow for future installation of a <br />Photovoltaic (PV) system. The project/ building developer shall comply with the <br />following requirements for making all houses on the subject site photovoltaic <br />ready. Making the home photovoltaic ready shall require the following measures <br />to be implemented with the construction of the structures covered: <br />a) Electrical conduit and cable pull strings shall be installed from the roof/attic <br />area to the buildings' main electrical panels. <br />b) Roof trusses shall be engineered to handle an addition load of five (5) <br />pounds per square foot beyond that of the anticipated load for the roofing <br />material. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.