My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENT 01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
020508
>
16 ATTACHMENT 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2008 3:05:29 PM
Creation date
1/30/2008 2:34:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/5/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
16 ATTACHMENT 01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
accomplished before September 15 and irrigated with a temporary irrigation <br />system to ensure that the grasses are established before October 15. No <br />grading shall occur between October 15 and April 15 unless approved erosion <br />control/storm water quality measures are in place, subject to the approval of <br />City Engineer/ Chief Building Official. Such measures shall be maintained <br />until such time as permanent landscaping is place. <br />c) Gather all construction debris on a regular basis and place it in a dumpster <br />or other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br />d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep <br />the street pavement adjoining the project site on a daily basis. Scrape <br />caked-on mud and dirt from these areas before sweeping. <br />e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt flowing in the storm drain system. Maintain and/or replace <br />filter materials to ensure effectiveness and to prevent street flooding. <br />f) Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the <br />site that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill. <br />g) Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain. <br />h) Ensure that concrete/gunite supply trucks or concrete/plaster operations do <br />not discharge wash water into street, gutters, or storm drains. <br />Stormwater Operation Requirements <br />53. All projects, unless otherwise determined by the City Engineer or Chief Building <br />Official, shall enter into a recorded Stormwater Treatment Measures Inspection <br />and Maintenance Agreement for ongoing maintenance and reporting of required <br />stormwater measures. These measures may include, but are not limited to: <br />a) A mechanism shall be created, such as a property owners' association, to <br />be responsible for maintaining all private streets, private utilities and other <br />privately owned common areas and facilities on the site including <br />stormwater treatment measures. These maintenance responsibilities shall <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.