My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
020508
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2008 2:13:01 PM
Creation date
1/30/2008 1:51:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/5/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City is also considering the installation of a PV system with the adaptive reuse <br />of the Firehouse Arts Center project. Staff is exploring this opportunity with the <br />architect and obtaining cost estimates for the installation. <br />In addition, the City is considering the feasibility of installing a photovoltaic system at <br />the City's Operations Service Center (OSC). An evaluation of city facilities <br />concluded that the OSC was the best candidate for a PV system that would meet the <br />minimum size criteria (200kW) for a Power Purchase Agreement (PPA.) Energy <br />Solutions of Oakland has preformed a detailed study of the site and recommends <br />that the City explore the PPA or leasing options to finance the proposed 203 kW <br />system. We anticipate bringing this matter back to the City Council later this year. <br />CONCLUSION <br />In summary, staff will begin work on creating the branding material for the Solar Cities <br />program, developing the Starter Kit and website, and arranging for public workshops to <br />educate the community on the benefits of solar energy. Once the program geared <br />towards existing residential consumers is fully operational, staff will provide Council with <br />a status report and recommendations on the program. The anticipated date for this <br />update is in the fall of 2008. <br />Submitted by: <br />Fiscal Review: <br />Approved by: <br />` ~ ~._ <br />ie Yuan- David P. Culver ~L' <br />ssistant City Manager Director of Finance <br />Attachments: <br />Exhibit A -Spectrum Energy Inc. Report <br />Exhibit B -Proposed Starter Kit <br />Page 6 of 6 <br />Nelson Fialho <br />City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.