My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
020508
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2008 2:12:47 PM
Creation date
1/30/2008 1:43:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/5/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />Compensation for <br />Landscape and Gateway Improvement Project at the Hopyard Road and I-580 Interchange <br />December 19, 2007 <br />C. REIMBURSABLE SUBCONSULTANTS: <br />Subconsultants to Tanaka Design Group are included in the fees stated above. Professional service fees <br />of authorized subconsultants of the project will be reimbursed at cost plus 10% for coordination and <br />processing. <br />D. ADDITIONAL SERVICES: <br />Additional Services requested by the Client that are beyond the scope of services listed above will be on <br />an hourly basis at the rates as listed below, and will be billed as Additional Services not included in the <br />above maximum fee. Examples of additional services are attending meetings requested by the Client that <br />exceed the quantity of meetings proposed, preparing and submitting drawings and documents more often <br />than what is proposed, or revising drawings due to changing schedule or budgets. These services will not <br />be pertormed without prior approval by the Client. <br />If the established construction budget or schedule changes significantly, or after the various documents or <br />products prepared by Tanaka Design Group have been approved, the Client makes a decision which, for <br />its proper execution involves Additional Services and expenses for changes in or additions to the <br />documents or products, or if the Landscape Architect be put to labor or expenses by delays caused by <br />the Client, his client, his agents, the Contractor, or by the delinquency or insolvency of either, or as a <br />result of damage by fire or other casualty, the Client shall compensate the Landscape Architect for such <br />Additional Services and expenses in accordance with the paragraphs above. <br />HOURLY BILLING RATES: <br />^ Principal $ 120 per hour <br />^ Project Manager $ 105 per hour <br />^ AutoCad Job Captain $ 90 per hour <br />^ Administrative/Clerical $ 50 per hour <br />Existing Information <br />The Client will furnish the Landscape Architect with any plans of the site showing existing or proposed <br />information and architectural items, including recently prepared topographic survey map, plumbing, <br />electrical, grading, drainage, irrigation, and mechanical plans, and property lines. <br />End of Exhibit B <br />Tanaka Design Group Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.