My WebLink
|
Help
|
About
|
Sign Out
RES 87111
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2012 4:26:30 PM
Creation date
12/11/1999 12:06:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/17/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 87-111 <br /> <br /> RESOLUTION OF INTENTION TO ORDER IMPROVEMENT IN <br /> ASSESSMENT DISTRICT NO. 1988-9 <br /> NORTH PLEASANTON IMPROVEMENT DISTRICT NO. 5 <br /> <br /> The City Council of the City of Pleasanton resolves: <br /> <br /> This Council intends to order the followin~ improvement <br />under the authority of the Municipal Improvement Act of 191~: <br /> <br /> The District shall be assessed at a uniform rate for the cost <br /> of the freeway facility improvement described below. <br /> <br /> The construction, acquisition and installation of the followin~ <br /> State Highway improvements described herein, together with the <br /> acquisition of necessary lands and easements for right-of-way, <br /> appurtenant utilities and landscapin~ as follows: <br /> <br /> 1. MOpyard Road Interchange Road/I-S80 Interchange <br /> <br />a. Construction of a new three lane overorossin~ east of the <br /> existin~ two lane overcrossing. <br /> <br />b. Reconstruction of Hopyard Road between the intersections of <br /> Hopyard Road at Owens Drive and Dou~herty Road at Dublin <br /> Boulevard to conform to new lane arrangements and street Erades. <br /> <br />o. Modification of all on and off-ramps to conform to new ~rades. <br /> <br />d. Widenin~ of both freeway off-ramps to four lanes (two right turn <br /> lanes and two left turn lanes) at the intersection of Hopyard <br /> Road. <br /> <br />e. Si~nalization of the intersections formed by the freeway <br /> off-ramps and Hopyard Road. <br /> <br />f. Land acquisition. <br /> <br />2. 1-580 Auxiliary Lanes from Hopyard Road to 1-880 <br /> <br />a. Construction of an additional lane on eastbound 1-580 be~innin~ <br /> at the 1-880 on-ramp to 1-580 and endin~ at the off-ramp at <br /> Hopyard Road. The off-ramp at Hopyard Road will be converted to <br /> a two lane exit. <br /> <br />b. Construction of an additional lane on westbound I-~80 be~innin~ <br /> at the loop on-ramp at Hopyard and endin~ with the 1-880 <br /> off-ramp. The off-ramp at 1-880 will be converted to a two lane <br /> off-ramp requirin~ modification of the existin~ brid~e over the <br /> Alamo Canal. <br /> <br /> ORIGINAL <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.