My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 3
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
012908
>
04 ATTACHMENT 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2008 4:56:38 PM
Creation date
1/23/2008 4:51:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/29/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
04 ATTACHMENT 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT 3. Circulation Element <br />Combined with 22.2 <br />Program 22.10: Develop the Downtown portion of the Alameda Countv <br />Transportation Corridor for pedestrian, bicyclists and parking, <br />consistent with the 2002 Master Plan for the Downtown Parks <br />and Trails System and with the Downtown Specific Plan. <br />~& . <br />From Energy Element Program 22.11: Consider creating aCity-sponsored self-service bicycle-sharing <br />4Fr.40~ program. <br />Policy Create and maintain a safe and convenient pedestrian system which encourages <br />23: walking as an alternative to driving. <br />Program~H Require developers to finance and install sidewalks and <br />23.1: pedestrian pathways in future developments. <br />Program Develop a pedestrian trail system which connects <br />-1H:23.2: all major portions of the Planning Area. <br />Program Cooperate with East Bay Regional Parks District in completing a <br />4Fi23.3: regional trail system and with Zone 7 in completing its Arroyo <br />Management Plan. <br />Moved from Energy Element program 23.4: As part of the pedestrian and bicycle master plan,~erform a <br />~~' comprehensive review of factors to improve the walkability and <br />safety of pedestrian corridors. <br />Program 23.5: Improve the safet~of bicyclists and pedestrians by educating all <br />residents about bicycle and pedestrian safety. at3 <br />. Continue programs of the Police Department <br />such as Bicycle Rodeos, bicycle and pedestrian pamphlets, and <br />classroom education. <br />From policy 2445: In cooperation with the Pleasanton Unified School District, explore ways to <br />Enerav <br />Element reduce auto traffic related to schools. <br />From Energy Element program Working with the Pleasanton Unified School District, continue <br />4524.1: to implement the Rides to School program. <br />Circulation Element 012908 redline 3-49 City Council Ol 29 08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.