My WebLink
|
Help
|
About
|
Sign Out
RES 87065
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2012 4:12:13 PM
Creation date
12/10/1999 11:49:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/17/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engir'~c,.'s <br /> Planners <br /> Economists <br /> Scientists <br /> <br /> December 11, 1986 <br /> <br /> F21061.A1.00 <br /> <br /> Mr. Joseph Elliott <br /> Director of Public Works <br /> City of Pleasanton DEC' <br /> 200 Old Bernal Avenue <br /> Pleasanton, California 94566 <br /> <br /> Dear Mr. Elliott: <br /> <br /> Subject: Sycamore Reservoir <br /> Project Schedule <br /> <br /> I have enclosed Exhibit B, Project Schedule, missing from <br /> the package delivered to you yesterday, as well as a cor- <br /> rected copy of our proposed Contract Amendment. As we dis- <br /> cussed, CH2M HILL'will proceed with design of Sycamore <br /> Reservoir under our current contract dated March 4, 1986, <br /> and Amendment No..1 dated June 18, 1986. In particular, we <br /> will proceed as rapidly as possible to assist your staff in <br /> obtaining an appraisal for the reservoir property, which you <br /> have identified as an immediate need. <br /> <br />Before proceeding with a shorter project schedule than that <br />shown on Exhibit B, you may wish to review your project <br />needs. Even with an accelerated schedule, Sycamore Reser- <br />voir will not be available for service during the high water <br />demand period of 1987. However, we anticipate no difficulty <br />meeting project completion for summer 1988 using a conven- <br />tional project approach. If the City needs Sycamore Reser- <br />voir on line as soon as possible, there are techniques <br />available which can significantly shorten design and con- <br />struction time. However, these options, such as prequalifi- <br />cation of construction contractors, accelerated design, and <br />intensified construction management, will result in higher <br />design and construction costs. <br /> <br />CH2M HILL <br />San Froncisco r'~tgionol Office 2200 Powell Street 8th Ftoof, Emeryville, Collfofnio 94608 415652.2426 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.