My WebLink
|
Help
|
About
|
Sign Out
RES 87098
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2012 4:22:08 PM
Creation date
12/10/1999 11:43:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/17/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I.NSERT <br /> <br /> Valley Avenue Crossing BO-67.73 <br /> City of Pleasanton <br /> <br /> 12. Railroad shall furnish all necessary labor, materials, <br /> tools and equipment and shall perform the following work: <br /> <br /> (a) preparatioh of subgrade, including .installation of <br /> geotexti~e fabric and drain pipe; <br /> <br /> (b) relay of rail and ties; and <br /> <br /> (c) install two (2) flashing light grade crossing <br /> signals equipped with automatic gate arms and <br /> additional light units mounted on cantilever <br /> arms, together with all necessary actuating and <br /> operating circuits and adequate instrument housing, <br /> hereinafter collectively ~eferred to as "signals," <br /> at said highway. Said signals shall be located <br /> approximately as shown on the print of Railroad's <br /> Drawing R-1943, Sheet No. 1, dated March 11, 1986, <br /> attached and made a part hereof. Installation of <br /> and all materials.for said signals shall be in <br /> accordance with Railroad's usual standards. <br /> <br /> 13. Grantee agrees to reimburse Railroad for one hundred percent <br /> (100%) of the cost and expense incurred by Railroad in furnishing <br />materials and performing work specified in Section 12 above. <br /> <br /> 14. Following execution of this instrument, Railroad will order <br />the delivery of all materials required to perform the work Contemplated <br />herein and shall submit to Grantee a bill for eighty percent (80%)'of <br />Grantee'=-share of the estimated cost of materials to be furnished by <br />Railroad. As soon as.the crossing signals and/or the crossing surface <br />have been placed in operation, Railroad shall submit to Grantee bills <br />for eighty percent (80%) of Grantee's share of the estimatedlcost of <br />applicable labor furnished by Railroad. Following completion of audit, <br />Railroad shall submit to Grantee a final bill for the actual total cost <br />of the work performed by Railroad, less. the progress.payments made by <br />Grantee hereunder. Grantee shall pay-all of such bills promptly. <br /> <br /> In the event progress payments made by Grantee exceed the audited <br />total final cost, the difference shall be promptly refunded to Grantee <br />by Railroad. <br /> <br /> 15. The work to be performed by Railroad .hereunder shall be com- <br />menced as soon as labor and materials are available, following execution <br />of this instrument,.and shall be completed within one (1)'year thereafter. <br /> <br /> 16. After installation of said signals has been completed, Railroad <br />shall maintain same so long as they remain in place. Cost of maintaining <br />said signals shall be apportioned between the parties hereto in accordance <br /> <br /> Page i of Insert <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.