My WebLink
|
Help
|
About
|
Sign Out
20 ATTACHMENT 07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
011508
>
20 ATTACHMENT 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2008 11:38:21 AM
Creation date
1/11/2008 11:31:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
20 ATTACHMENT 07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"~ <br />L ..__v _ Arct~ite:ctzs~`~ <br />>Cl< Fotr~Ct~ `°. ~e~~~t <br />~)<. , s , ~~~,?7 <br />October 10, 2007 <br />Becky Hopkins <br />Recreation Supervisor <br />4333 Black Avenue <br />Pleasanton, CA 9466-0802 <br />Email bhopkins~c~ci.pleasanton.ca.us <br />Subject: Landscape Architectural Services <br />For the Gingerbread Pre-school Construction Documents <br />,,, •' <br />,; °~ Dear Becky: <br />We have simplited the design plan and as a result have been able to reduce the original fee for construction <br />documents. The following items have either been simplified, reduced in size or eliminated and they are as <br />follows: <br />a) Simplified fencing configuration <br />b) Removed trellis at the front door (southerly elevation) and added trees for shade. <br />c) Curved trellis along the western elevation, changed to a rectangular trellis <br />d) Eliminated gazebo <br />e) Eliminated the web climber <br />f) Eliminated the wood bridge between the swing area and mud zone <br />g) Reduced the berm and reduced the grass area <br />h) Simplified the story circle area <br />i) Eliminated the light pole <br />As a result of the above items, our detailing for the play components won't be as intensive or lengthy. Based <br />on the above modifications, the estimated construction budget is $326,000 After the two public meetings that <br />we will attend and the final master, we can then proceed with the construction documents. Once we receive <br />authorization, it will take us approximately 3 months to complete those documents. During this <br />documentation period, the city will have two opportunities to review the progress at the 50% and 90% detail <br />design. Once the construction documents are 100% completed, they can be put out for bid which generally <br />takes 3-4 weeks. I spoke with Mike Fulford and it is his opinion that the play area can be constructed within 3 <br />months which is less than I originally had said. Once we receive authorization to proceed on the contract <br />documents, we can put together a final schedule with specific milestones and deliverables. <br />SERVICES: Refer to the attached EXHIBIT A for scope of services. <br />COMPENSATION: For the above professional services the Landscape Architect shall be paid as follows: <br />1. Landscape Architectural Fee: Lump sum of $ 40,000 <br />tf.'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.