My WebLink
|
Help
|
About
|
Sign Out
20 ATTACHMENT 07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
011508
>
20 ATTACHMENT 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2008 11:38:21 AM
Creation date
1/11/2008 11:31:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
20 ATTACHMENT 07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 7 <br />SECOND AMENDMENT TO AGREEMENT <br />This Second Amendment to Agreement is entered into this 15~' day of January <br />2008 by the City of Pleasanton ("City") and Keller Mitchell & Co. ("Contractor") <br />Whereas, on Apri120, 2007„ the City and Keller Mitchell & Co. entered into a <br />Professional Services Agreement (City reference number 07-033) for landscape design <br />services to develop a Master Plan for the Gingerbread Preschool Play Yard, that was <br />amended by a First Amendment to Agreement on September 13, 2007, to provide an <br />alternative Master Plan with a lower cost option; and <br />Whereas, the Contractor has successfully completed the outlined tasks and the <br />Scope of Work has expanded to completing the Gingerbread Preschool construction <br />documents; and <br />Whereas, the parties desire to amend the Agreement. <br />Now, therefore, the parties agree as follows: <br />1. Section 1 Exhibit A of the Agreement, "Scope of Services and Work <br />Product" is amended to: <br />• Design Scope including exterior paving, play yard design, site <br />amenities, fencing, site grading, planting and irrigation. <br />• Design Development based on the approved site studies, estimated <br />construction budget and preparation and design development <br />drawings. <br />• Construction Documentation to include dimension plan, grading plan, <br />landscape construction details, structural details, planting plan, <br />irrigation plan and specifications section. <br />• Construction Consultation to include site visits and to inform the client <br />of the progress and quality of work. <br />• Complete documents within three (3) months from the approval date <br />of the second amendment or by April 11, 2008, whichever occurs first. <br />2. Section 5 -Compensation. Compensation for this revised scope of work <br />will not exceed $40,000. However, the City may, at its discretion, request <br />that the Contractor provide additional services at the hourly rates set forth <br />in the attached. <br />3. All other terms and conditions of the Agreement shall remain in full force <br />and effect. <br />In witness whereof, authorized representatives of the parties have executed this First <br />Amendment to the Agreement as of the date and year first above written. <br />
The URL can be used to link to this page
Your browser does not support the video tag.