My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
011508
>
18 ATTACHMENT 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2008 3:39:23 PM
Creation date
1/10/2008 3:34:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENT 15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
68. The project developer shall construct vertical P.C.C. curbs and gutters within this <br />development unless otherwise approved by the City Engineer. <br />69. All existing septic tanks or holding tanks shall be removed or sealed, filled, and <br />abandoned, pursuant to the requirements of the Alameda County Department of <br />Health Services. <br />70. The haul route for all materials to and from this development shall be approved by <br />the City Engineer prior to the issuance of an encroachment permit. <br />71. The project developer shall submit a dust control plan or procedure as part of the <br />improvement plans. <br />72. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of <br />a dedicated public street or public service easement approved by the City Engineer <br />shall be privately maintained by the property owners or through an association <br />approved by the City. <br />73. The design of the water supply and sanitary sewer systems shall be subject to the <br />review and approval of the City Engineer. <br />74. Approval of the storm drainage system shall be subject to the review and approval <br />of the City Engineer that the system is adequate, connects to an approved point of <br />dischazge, and meets the immediate and long-range requirements of this <br />development. <br />7S. Electric power distribution, gas distribution, communication service, cable <br />television, and any required alarm systems shall be installed underground in a joint <br />utility trench. <br />76. The project developer shall be responsible for the installation of the street lighting <br />system serving the development. The street lights shall be 70-watt, high pressure <br />sodium vapor units mounted on galvanized steel poles with poured in place bases, <br />on the LS-1C schedule per City requirements and P.G.& E. standard details, unless <br />otherwise specifically approved. Approval for the number, location, and type of <br />electroliers shall be subject to the review and approval'of the City Engineer. <br />77. The project developer shall submit detailed landscape and irrigation plans as part <br />of the improvement plans. These plans should include a landscape plans for the <br />landscape area facing Vineyard Avenue. The irrigation plan shall provide for <br />automatic controls. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.