Laserfiche WebLink
accordance with the final approved grading plan, and the required reports have been <br />submitted. <br />.».. <br />~~ <br />sue' <br />For SL• l foot .304.8 mm <br />FIGURE J-1 -SETBACK DIMENSIONS <br />20.08.083 Section 2308.3.4 amended -Braced wall line support. <br />Section 2308.3.4 Braced Wall Line Support of the California Building Standards Code <br />2007 Edition, (24 C.C.R.), and including by reference the International Building Code, <br />2006 Edition, Volumes 1 and 2 is amended to read as follows: <br />2308.3.4 Braced wall line support. Braced wall lines shall be supported by continuous <br />foundations. <br />20.08.086 Section 3402.1 amended -Definitions. <br />Sections 3402.1 Definitions of the California Building Standards Code 2007 Edition, (24 <br />C.C.R.), and including by reference the International Building Code, 2006 Edition, <br />Volumes 1 and 2 is amended to read as follows: <br />PRIMARY FUNCTION. As determined by the Chief Building and Safety Official primary <br />function is a major activity for which the facility is intended. Areas that contain a primary <br />function include, but are not limited to, the customer service lobby of a bank, the dining <br />area of a cafeteria, the meeting rooms in a conference center, as well as offices and <br />other work areas in which the activities of the public accommodation or other private <br />entity using the facility are carried out. Mechanical rooms, boiler rooms, supply storage <br />rooms, employee lounges or locker rooms, janitorial closets, entrances, corridors and <br />restrooms are not areas containing a primary function. <br />TECHNICALLY INFEASIBLE. Where determined by the Chief Building and Safety <br />Official any alteration of a building or a facility that has little likelihood of being <br />accomplished because the existing structural conditions require the removal or <br />~o <br />