Laserfiche WebLink
Table 7 -1: Zone 7 2007 Long -tens Sustainable Water Supply <br />AFA <br />State Water Project <br />60,900 <br />Lake Del Valle <br />9,300 <br />BBID <br />2,000 <br />Zone 7 Sustainable Supply Subtotal <br />72,200 <br />Retailer Groundwater Safe Yield Quantity <br />13,400 <br />Recyded Water supply <br />1,900 <br />Total Sustainable Water Supply <br />87,600 <br />Source: Zone 7 Water Agency Annual Review Of The Sustainable Water Supply, May 18, 2007. <br />City of Pleasanton <br />Final Water Supply Assessment <br />Stoneridge Drive Specific Plan Amendment and Staples Ranch Project <br />6.0 Supply Demand Comparison <br />7.0 Supply- Demand Comparison <br />This section reviews the regional, local, and project -level supply and demand considerations. <br />7.1 Regional Water Supply Sufficiency <br />Zone 7, as the Tri- Valley wholesale water provider, adopted a Water Supply Reliability Policy in <br />2002 (Board Resolution No. 04-2662) and revised the resolution in 2004. This policy states <br />"maintain the ability to meet 100 percent of Zone 7's estimated treated water demands 100 percent <br />of the time, including during a multi -year drought period." The "Reliability Policy for Municipal and <br />Industrial Water Supplies,' adopted by the Zone 7 Board in May 2002 and revised in August 2004 <br />has two "Goals', the most important for water supply, reads: <br />Goal 1: meet 100 percent of its treated water customers water supply needs in <br />accordance with Zone l's most current contracts for Municipal and Industrial (M&I) <br />Water Supply, including existing and projected demands for the next twenty (20) <br />years, even during extended drought periods. Zone 7 will endeavor to meet this goal <br />during an average water year, a single dry water year, and multiple dry water years. <br />In April of every year, Zone 7 prepares an assessment of sustainable water supplies for the <br />Livermore- Amador Valley. As shown in Table 7 -1 below, the 2007 sustainable supply is 87,500 AF <br />as presented in Zone 7's 2007 Sustainable Water Supply Report (Appendix A] and current estimated <br />2030 "Buildout Demand" is 69,370 AF. Operational studies used in this assessment demonstrate <br />that Zone 7 has sufficient water supply to meet this future demand for every hydrologic year on <br />record.' The 2007 Sustainable Water Supply Report concludes that Zone 7 has sufficient <br />sustainable supplies to provide for all treated water demands through build -out and for all currently <br />contracted untreated water demands. Again, as previously discussed in Section 4, Zone 7's <br />reliability to deliver water to the Livermore- Amador Valley is secured in a variety of water supply <br />sources that allows Zone 7 a great degree of flexibility within its supply portfolio to meet demands <br />through 2030. <br />35 2005 Zone 7 Water Agency, Urban Water Management Plan, page 25. <br />vv►W.e<- vw o.Mu ew ample' Raub W WInslWSAeoe <br />7 -1 <br />