My WebLink
|
Help
|
About
|
Sign Out
10 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
121807
>
10 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2007 4:00:18 PM
Creation date
12/12/2007 3:54:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/18/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
10 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton 4.0 Water Agency Background <br />Final Water Supply Assessment <br />Stoneridge Drive Specific Plan Amendment and Staples Ranch Project <br />Pleasanton submits a request each year for a treated supply quantity not less than the water <br />delivered during the current year. The requested amount must also fall within the designated water <br />supply schedule. <br />Table 5-6: City of Pleasanton Normal/Average Year Supply Sources (AFA) <br /> Su I Pro actions <br />Treated Water Purchase Year 2005 2010 2015 2020 2025 2030 <br />Purchased from Zone 7a 14,553b 18,320 21,800° 22,700 23,400 23,400 <br />GPQ 3,500 3,500 3,500 3,500 3,500 3,500 <br />Total Su I 19,170 21,820 25,300 26,200 26,900 26,900 <br />Notes: <br />GPQ: Groundwater Pumping Quota <br />a. City of Pleasanton purchases 80% of supply Zone 7 through an annual Contractor/Purchase delivery request, Table 8 Water Demands by <br />Customer from the 2005 Zone 7 Water Agency Urban Water Management Plan, page 35 (from 2010 into the future). <br />b. City of Pleasanton's Actual Purchase Amount <br />c. Buildout occurs in 2025 - it is estimated that demands would not change dramatically after buildout table assumes "natural conservation through <br />new fixtures" 2002 Ci of Pleasanton Urban Water Mana ement Plan, Table 3-2 Baseline Water Pro'ections a e 3-8. <br />Over the past ten years, 75 to 80 percent of Pleasanton's annual water requests have been met by <br />Zone 7 deliveries. In fact, deliveries to Pleasanton account for about 40 to 45 percent of the total <br />treated water available to Zone 7 from all of its available treated water supplies. It is reasonable to <br />assume, based upon historical reliability, that Pleasanton would continue to receive a minimum of 80 <br />percent of its treated water supplies to buildout in 2025 and beyond to 2030 from Zone 7. This <br />percentage was used to determine the City's share of the available treated water supplies from <br />Zone 7. In 2005, the City, per the agreement with Zone 7, requested 15,670 AF; however, actual <br />use equaled 14,533 AF, or a decrease due to lower demand, of about 1,100 AF. Assuming buildout <br />in 2025 and average daily demands ranging from approximately 16 mgd (at present) to 24 mgd (at <br />buildout) by the City, it appears that Zone 7 has sufficient water supplies to serve the City's new <br />water demands up to and including build out conditions and to 2030. This assumes that <br />approximately 40% (current percentage) of the future total water supply available to Zone 7 is <br />delivered to the City of Pleasanton. <br />P:\Projecls - WP Only\41162.01 Staples Ranch WSA\Final\Final WSA.doc 5-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.