Laserfiche WebLink
_._. __ <br />. -.. <br />• ...~ -~ <br />_..~... }•___ ._ _ C~ <br />"~-."~."'"_~.`----~~ Ra~a~clan~l Itnlirc~~cmcnts <br />- _ .5j~_~i;!Iiii~cin.of;u'-pu~~cr~•d~~.il.:r~lrli~~_i~ ~';~r!~~:<<,,~,•k <br />FRE/TAS RANGELAND IMPROVEMENTS RESPONSIBILITIES <br />1. SOLAR-POWERED WATER PUMPING SYSTEM: <br />a. Initial site visit(s) (design data collection), <br />b. System engineering = (2), <br />c. Component & materials quoting, <br />d. Submit to client, <br />e. Pick-up/deliver all materials/equipment related to my responsibilities. <br />2. SOLAR-POWERED WATER PUMPING COMPONENT INSTALLATION: <br />a. Locate pump and solar array in the pre approved location, <br />b. Properly connect electrical components of solar system (modules, <br />controller, pump, full-tank shut-off, etc.), <br />c. Assemble PV rack and mount modules according to manufacturers <br />specifications, <br />d. Install solar array mounting pole, <br />e. Pull electrical, <br />f. Properly interconnect the system, <br />g. Test pump, <br />h. Activate system 8~ pump water into storage tank(s), <br />i. Site clean up. <br />3. WATER SUPPLY PIPELINE(S): <br />a. Trench 11,500' (~18"depth when possible) to all (3) water storage <br />tanks and to (5) livestock watering troughs, <br />b. Plumbing into and out of the three water storage tanks, <br />c. Plumb 5 troughs with float valves (3 new valves, 2 existing valves), <br />d. Install ball valves at each trough, the property line and at the <br />beginning of each distribution pipeline, <br />e. Pipeline route will be determined by terrain and accessibility. Final <br />decision is that of Freitas Rangeland Improvements, <br />f. all exposed pipelines will be insulated and wrapped, <br />g. includes all valve enclosures. <br />LicensedBonded Jed Freitas -Owner <br />NRCS Technical Service Provider (925)580-6415 cell <br />