My WebLink
|
Help
|
About
|
Sign Out
21 ATTACHMENT 09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
120407
>
21 ATTACHMENT 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2007 2:27:29 PM
Creation date
11/29/2007 12:32:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/4/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
21 ATTACHMENT 09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^~^ KimleyHorn Supplemental Weekday/Weekend Traffic Analysis -Final Report <br />llt• and Associates, inc. Home Depot, Pleasanton, CA <br />For the uses with an AM pass-by rate of none, no AM pass-by was assumed in the <br />analysis because no ITE data was available; however, it is likely that some AM trips will <br />also be pass-by. The following pass-by rates were used in the calculations: <br />_._ __ <br />Grocery Store <br />• AM Pass-by Rate -None <br />• PM Pass-by Rate - 36% <br />Fast Food with Drive Through <br />• AM Pass-by Rate - 49% <br />• PM Pass-by Rate - 50% <br />Pharmacy with Drive Through <br />• AM Pass-by Rate -None <br />• PM Pass-by Rate - 49% <br />Retail <br />• AM Pass-by Rate -None <br />• PM Pass-by Rate - 34% <br />Weekday Project Trip Distribution and Assignment <br />Because of the nature of the development, most customers to the uses including the <br />grocery store are expected to travel from nearby locations in Pleasanton. <br />A project distribution was developed based the proximity of other similar uses including <br />the locations of existing grocery stores in the area. It was assumed that project trips <br />would principally originate from a two mile area surrounding the project site. It was <br />assumed that approximately 20% of the trips would originate north of the project site, <br />40% of the trips would originate south of the project site, and 40% of the trips would <br />originate west of the project site. The intersections most likely to be affected by a <br />change in project traffic would include: <br />• Valley Avenue & Busch Road <br />• Stanley Boulevard & Valley Avenue / Bernal Avenue <br />• Bernal Avenue & Vineyard Avenue <br />• First Street & Vineyard Avenue <br />The intersections most likely to be affected were determined qualitatively and the level <br />of impact was not determined per the direction of city staff. <br />Weekend Project Trip Generation, Internal Capture, & Pass-by <br />Weekend trip generation was calculated for the proposed uses. The only change in <br />land use proposed is the grocery store instead of the Stanley Home Depot which is <br />based on ITE's Trip Generation Grocery Store land use (LU 850) and is shown in Table <br />12. <br />PleasantonHomeDepot08.FinalReport.doc 19 October 16, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.