My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
120407
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2007 2:27:52 PM
Creation date
11/28/2007 12:52:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/4/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2. Estimated Costs Through Yr 1 of Post-construction Monitoring <br />Bernal Bridge Wetland and Riparian Mitigation, City of Pleasanton, California <br />Direct Expenses <br />Mileage 5260 miles ~ $0.56 $2,946 <br />Equipment Costs (see Table 3) $3,942 <br />Per Diems <br />Reimbursable Costs <br />Other Travel, Subsistence trips ~ $0 <br />Postage, deliveries, express mail $150 <br />Maps and Aerial Photos $0 <br />Outside Copying, Blueprint $850 <br />Analytical Laboratory Fees $0 <br />Materials and Supplies $0 <br />Permits, Licenses or Agency Inspection fees cl/entrespons/bll/ty $0 <br />Other $0 <br />Subtotal ~ $7,888 <br />ESTIMATED TOTAL $7,888 <br />10% contingency/markup $789 <br />Notes TOTAL w/ CONTINGENCY $8,676 <br />Mileage will be charged at IRS allowable rate, presently $0.485/mi. The $0.56/mi rate anticipates an IRS rate increase. <br />Table 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.