My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
120407
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2007 2:25:43 PM
Creation date
11/28/2007 12:34:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/4/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FY2006-07 CAPITAL IMPROVEMENT PROGRAM <br />WATER PROJECTS <br /> Cart overo to FY07-08 <br /> <br />CIP # Eipansion <br />Fund <br />355 497 Replacement <br />Fund <br />345 <br />Total <br /> BEGINNING BALANCE $2 611 565 $11 087 330 $13 698 895 <br /> ESTIMATED REVENUES <br /> Water Connection Fees 106 365 0 $106 365 <br /> TOTAL FEE REVENUE $106 365 $0 $106 365 <br /> TRANSFER TO NEXT YEAR'S REVENUE <br /> Develo Revenue -Can on Meadows Meter Retrofit 0 0 $0 <br /> INTEREST INCOME Includin Pro'ect Reserves - ~' `' ¢ ~ $0 <br /> TOTAL ESTIMATED REVENUES $106 365 $0 $106 365 <br /> TRANSFERS FROM: <br /> Water M&O Fund - R lacement Accrual 0 0 $0 <br /> Water M&O Fund -- Debt Pa ents 2004 Water Revenue Bonds ~ Q: $0 <br /> Sewer R lacement Fund -- SCADA Com afar u de 0 0 $0 <br /> Vin azd Ave S ific Plan 0 0 $0 <br /> Water M&O Fund -- Pol bu lane R airs 0 0 <br /> TRANSFERS TO: 0 0 $0 <br /> Water Debt Service Fund - 2004 Bonds moved from ex nditures below p `' "4 $0 <br /> Loan from Water Replacement for Vineyard Corsidor Infrastructure Imprvements <br />Phase III <br />0 <br />0 <br />$0 <br /> NET TRANSFERS IN/ OUT $0 $0 $0 <br /> TOTAL FUNDS AVAILABLE $2 505 200 $11 087 330 $13 592 530 <br /> Ea nditures: <br />001000 Annual Water R lacement Pro'ects 0 98 233 $98 233 <br />001066 Water Loo Pi line -Bonde Loo 0 0 $0 <br />011012 Pimlico Dr Turnout & Water Transmission Line Reserve 204 282 673 420 $877 702 <br />011014 Transmission Main R lacement Reserve 0 147 000 $147 000 <br />011015 Installation of a Variable Fr uen Drive at Well No. 8 0 0 $0 <br />011016 Installation of a Permanent Generator at Well No. 8 0 0 $0 <br />Ol 1017 New Standb Power Generator: Water Portion 0 90 000 $90 000 <br />011022 Chlorine In'ection Sites 0 108 569 $108 569 <br /> <br />011023 Vineyazd Cortidor Infrastntcture Imp Phase III -Water Tank, Supply Lines, Pump <br />Station <br />1 223 821 <br />4 033 571 <br />$5 257 392 <br />031010 Electrical Panel U es and Restorations 0 62 266 $62 266 <br />031015 Pressure Reducin Valve Im rovements for Elillside Areas 0 465 000 $465 000 <br />031016 Water i Im rovement Pro'ect to Foothill Tank Additional Fundin 0 8 400 $8 400 <br />041000 Annual Water Im rovement Pro'eM 0 60 423 $60 423 <br />041008 Annual Automated Meter Readin Retrofit 0 382 $382 <br />041013 Annual R lacement of Pol bu lane Service Laterals 8c Irri tion Lines 0 7 135 $7 135 <br />041014 Bonde Zone/ Ru Hill Pi line 0 10 826 $10 826 <br />041015 Parallel Lon 'ew Pum Station Line 0 0 $0 <br />041040 Annual R lacement of Water Meters 0 180 781 $180 781 <br />048056 2004 Water Bonds -Annual Pa ants moved to transfers above 0 0 $0 <br />051015 SCADA Com uter Hazdwaze and Softwaze U e 0 100 584 $100 584 <br />051023 McCloud Water Tank R lacement Refiubishment 0 225 329 $225 329 <br />061000 Annual Water Im rovement Pro'ed 0 129 994 $129 994 <br />061006 Golden Ea a Farms New Water Stora a Tank 247 000 403 000 $650 000 <br />061008 Annual Automated Meter Readin Retrofit 0 50 000 $50 000 <br />061010 Electrical Panel U es and Restorations 0 40 000 $40 000 <br />061011 Annual Control Valve Installation 0 250 320 $250 320 <br />061013 Annual R Iacement of Pol bu lane Service Laterals & Irri ation Lines 0 50 281 $50 281 <br />071041 Water 8r Sewer Asset Mena ement Plan U e 0 41 781 $41 781 <br />801002 Can on Meadows Water Meter Retrofit 9 349 0 $9 349 <br />802010 Water & Sewer Main -Vin azd to Foxborou -Reimburse Develo 0 0 $0 <br />802011 Committee Vall Water Retailers 4 000 0 $4 000 <br />941015 Del Valle Parkwa Water Main Extension 208 694 377 197 $585 891 <br />971013 Water Connection Fee U ate 15 000 0 $15 000 <br />971014 Water S stem Master Plan U ate 19 107 6 369 $25 476 <br />991033 Generator Stud Water Portion 0 9 308 $9 308 <br />991034 U ade Turnouts to Accommodate Chemical Readouts 17 001 0 $17 001 <br />991035 Santos Ranch Road PS 510, 900 1300 Rehabilitation 0 284 326 $284 326 <br />999999 General Fund -- Utili Cut Patchin moved from transfers above d '- $0 <br />999999 General Fund --CIP En ' eerin moved from transfers above 0 $0 <br /> TOTAL WATER PROJECTS $1 948 254 $7 914 495 $9 862 749 <br /> ENDING WATER FUND BALANCE $556 946 $3 172 835 $3 729 781 <br />Water 07 Q4 Sally 11/21/2007 2:22 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.