My WebLink
|
Help
|
About
|
Sign Out
ORD 1962
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1962
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:47 PM
Creation date
11/7/2007 2:43:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
11/6/2007
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 1962
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33. The approved building materials and colors for each home shall be stated on the <br />building permit plans to the satisfaction of the Planning Director. Substitutions <br />shall not be allowed unless otherwise approved by the Planning Director. This <br />condition shall appear in the design guidelines. <br />34. The electrical plans for these homes shall provide telecommunications <br />infrastructure consistent with state-of-the-art methods, e.g., cabling for DSL, <br />broadband, or wireless service, wiring for total room access, etc., in effect at the <br />time that building permit(s) are issued. The plan shall be part of the building <br />permit plan set. <br />35. The Oak Grove Open Space & Common Area Design Guidelines shall be <br />amended to reflect the mitigation measures found within the FEIR to reduce an <br />impact to less than significant. The following are conditions of approval as well <br />as statements to be added to the Design Guidelines: <br />• The lot owner/contractor shall provide root control barriers and four inch <br />perforated pipes for parking lot trees, street trees, and trees in planting areas <br />less than ten-feet in width, as determined necessary by the Planning Director <br />at the time of review of the final landscape plans. <br />• Landscaping installation time requirements: <br />o Within 90 days of occupancy, all front and side yard area landscaping <br />shall be installed. <br />o Within 1 year of occupancy, all rear area landscaping shall be installed. <br />A cash deposit, in the amount of 25 percent of the estimated installation cost <br />for the rear yard landscaping shall be submitted to the Planning Department <br />at the time of building final which shall be returned to the owner after site <br />inspection determines the yard landscaping has been completed. This <br />condition shall appear in the design guidelines. <br />The Oak Grove Open Space & Common Area Design Guidelines shall be <br />implemented by the project developer as conditions to the subject property. <br />36. The project developer shall work with staff to further refine the landscape design <br />guidelines. The revised guidelines shall be subject to review and approval by the <br />Planning Director. <br />Development Standards <br />37. Only the following structures, uses, and activities shall be allowed in the open <br />space areas of the development covered by this approval: <br />a. Only the grazing of cattle, sheep, and goats shall be allowed on the open <br />space areas surrounding the 51 lots of this development. The grazing <br />activity, animal density, and supervision shall be subject to a grazing <br />Page 13 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.