My WebLink
|
Help
|
About
|
Sign Out
ORD 1961
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:47 PM
Creation date
11/7/2007 2:39:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
11/6/2007
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 1961
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The project developer shall undertake a detailed, design-level geotechnical <br />investigation and, based upon this investigation, shall submit adesign-level <br />report with the tentative subdivision map that incorporates and further develops <br />the conclusions and recommendations of the existing planning/development level <br />geotechnical report and the comments and recommendations provided by the <br />City's peer review geologist/geotechnical engineer. The report shall be subject to <br />the review and approval by the City Engineer before the Planning Commission's <br />action on the tentative subdivision map. <br />• To ensure that buildings and other subdivision improvements are not damaged <br />by differential settlement at the project site, the report shall include specific <br />recommendations for mitigating potential settlement associated with native soil/fill <br />boundaries and areas of different fill thickness, including recommendations to the <br />City Engineer for dealing with differential cut and fill that would affect building <br />pads, streets, and utilities. <br />• All investigative trenches and test pits not fully excavated during the course of <br />normal site grading and site preparation shall be specifically excavated and <br />brought to grade with properly compacted fill to the satisfaction of the City <br />Engineer. <br />(ii) Remaining Impacts. <br />Any remaining impacts related to differential settlement will be less than significant. <br />Hazards and Hazardous Materials <br />1. Hazardous materials use during construction (pp. 163, 164 and 366-367; <br />Condition 80d, 80f, 83c, 88, and 94 of PUD-33; MMIP G1). <br />a. Potentiallmgact. <br />Improper use, storage, or disposal of hazardous materials during construction activities <br />could result in releases affecting construction workers, the public, and the environment. <br />b. Mitigation Measures. <br />The following mitigation measure is hereby adopted and will be implemented as <br />provided for in the Mitigation Monitoring and Implementation Program: <br />• Implement Oak Grove Planned Unit Development (PUD-33) Mitigation <br />Measure G1. <br />Exhibit A Page 31 of 45 Ordinance No. 1961 <br />PUD-33, Oak Grove <br />
The URL can be used to link to this page
Your browser does not support the video tag.