Laserfiche WebLink
12. The windows on all of the new units (Lots 2-5) shall be recessed two inches, <br />glazed, with wood trimmed windowsills. No reflective glass is allowed. The <br />window glazing shall be clear with no tint. The windows shall be reviewed and <br />approved by the Planning Director prior to issuance of a building permit. <br />13. All condensing units shall have the lowest noise rating. The location shall be <br />reviewed and approved by the Planning Director prior to building permit issuance. <br />The applicant may be required to install attic mounted HVAC units in order to <br />maintain clear garage floor area. <br />14. The chain link fence shall be removed and replaced with picket style fencing not <br />to exceed 42 inches in height and is subject to review and approval by the <br />Planning Director prior to issuance of a building permit. <br />15. In order to meet the stormwater (C3) requirements, the paver bands may have to <br />be widened and/or relocated and are subject to review and approval by the <br />Planning Director and the City Engineer prior to issuance of a building permit. <br />16. All new homes and the renovated existing home are required to be a "green <br />home". Prior to building permit submittal, a list of the green building measures <br />used in the design of the new homes and renovation of the existing home <br />covered by this approval shall be provided to the Planning Department for the <br />review and approval by the Planning Director. The homes covered by this <br />approval shall be designed to achieve a "certified rating" of a minimum of 50 total <br />points, with achieving the minimum points in each category, using Build It <br />Green's 2007 GreenPoints rating system. The green building measures shall be <br />shown on one of the first two pages of the plans submitted for issuance of a <br />building permit. Each point identified shall have a notation showing which <br />sheet the item can be found and each sheet shall note where the point is <br />located. All proposed green building measures shall be shown throughout the <br />plan set, as appropriate, as determined by the Planning Director and the Chief <br />Building Official. A special inspection by a representative from the Planning <br />Department shall be coordinated with regards to landscaping, irrigation, and <br />exterior materials. All of the green building measures indicated on the approved <br />checklist shall be inspected and approved by either the City of Pleasanton, a <br />qualified specialist, or the applicant shall provide written verification by the project <br />engineer, architect, landscape architect, or designer. <br />17. All residences in the PUD shall be constructed to allow for future installation of a <br />Photovoltaic (PV) system. The project/ building developer shall comply with the <br />following requirements for making all houses on the subject site photovoltaic <br />ready. Making the home photovoltaic ready shall require the following measures <br />to be implemented with the construction of the structures covered: <br />a) Electrical conduit and cable pull strings shall be installed from the roof/attic <br />area to the buildings' main electrical panels. <br />