My WebLink
|
Help
|
About
|
Sign Out
PC-2007-41, PUD-64, 4238 FIRST STREET LLC
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-41, PUD-64, 4238 FIRST STREET LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:45 AM
Creation date
11/7/2007 11:43:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/10/2007
DOCUMENT NO
PC-2007-41, PUD-64, 4238 FIRST STREET LLC
DOCUMENT NAME
PUD-4
NOTES
4238 FIRST STREET LLC
NOTES 2
REZONING
NOTES 3
4238 FIRST STREET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
are tolerant of saturated soil conditions and prolonged exposure to <br />water shall be specified. Soil shall be amended as required. <br />3) Plant materials selected shall be appropriate to site specific <br />characteristics such as soil type, topography, climate, amount and <br />timing of sunlight, prevailing winds, rainfall, air movement, patterns of <br />land use, ecological consistency and plant interactions to ensure <br />successful establishment. <br />4) Landscaping shall also comply with City of Pleasanton ordinances and <br />policies regarding water conservation. <br />e) Prior to grading permit issuance the project developer shall submit a copy of <br />the State Water Resources Control Board Notice of Intent (NOI) for <br />coverage under the State Construction Storm Water General Permit for <br />projects with clearing, grading and excavation exceeding the current <br />standards. <br />f) Roof drains shall discharge and drain away from the buildings foundation to <br />an unpaved area wherever practicable. <br />Stormwater Construction Requirements <br />52. The project development shall submit a Stormwater Pollution Prevention Plan <br />(SWPPP) for review and approval by the City Engineer prior to issuance of <br />building or grading permits. Failure to comply with the approved construction <br />SWPPP may result in the issuance of correction notices, citations or stop work <br />order. The following construction Best Management Practices (BMPs), as well as <br />any other applicable measure, shall be included in the SWPPP and implemented <br />as approved by the City. <br />The project developer is responsible for implementing the following measures <br />during all construction phases of the project: <br />a) The project developer shall include erosion control/stormwater quality <br />measures on the final grading plan which shall specifically address <br />measures to prevent soil, dirt, and debris from entering the storm drain <br />system. Such measures may include, but are not limited to, hydroseeding, <br />hay bales, sandbags, and siltation fences and are subject to the review and <br />approval of the City Engineer/Chief Building Official. If no grading plan is <br />required, necessary erosion control/storm water quality measures shall be <br />shown on the site plan submitted for an on-site permit, subject to the review <br />and approval of the Chief Building Official. The project developer is <br />responsible for ensuring that the contractor is aware of and implements <br />such measures. <br />b) All cut and fill slopes shall be revegetated and stabilized after completion of <br />grading, but in no case later than October 15. Hydroseeding shall be <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.