My WebLink
|
Help
|
About
|
Sign Out
PC-2007-38, PDR-669, CRAIG MIERS
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-38, PDR-669, CRAIG MIERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:45 AM
Creation date
11/7/2007 11:36:15 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/26/2007
DOCUMENT NO
PC-2007-38, PDR-669, CRAIG MIERS
DOCUMENT NAME
PDR-699
NOTES
CONSTRUCT 35,000 OFFICE BLD
NOTES 2
530 BOULDER COURT
NOTES 3
HACIENDA BUSINESS PARK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
39. Prior to issuance of a building permit, the project developer shall pay the <br />applicable Zone 7 and City connection fees and water meter cost for any water <br />meters, including irrigation meters. Additionally, the developer shall pay any <br />applicable DSRSD sewer permit fee. <br />40. The project developer shall submit two copies of the site soils report to the <br />Building and Safety Division for third party peer review and shall pay for such <br />review at the time but in all cases before the issuance of a grading permit. <br />41. The soils engineer shall certify the pad compactions of the lot containing fill to the <br />satisfaction of the Building and Safety Division prior to issuance of building <br />permits. <br />42. All structures covered by this approval shall be constructed to: <br />a. Meet Title 24 state energy requirements, and <br />b. Comply with all codes and ordinances in effect before the Building and Safety <br />Division will issue permits. <br />43. Final inspection by the Planning Department is required prior to occupancy. <br />44. During construction, the project developer is responsible for implementing the <br />following measures: <br />a. Portable toilets shall be kept as far as possible from existing residences and <br />shall be emptied on a regular basis as necessary to prevent odor; <br />b. Ensure that the project contractor is aware of, and abides by, all conditions of <br />approval. The project developer is especially responsible for ensuring that <br />the contractor is aware of and implements all erosion control/storm water <br />quality measures; and <br />c. Ensure that the project landscape contractor is aware of, and adheres to, the <br />approved landscape and irrigation plans. <br />45. Prior to first framing inspection, the height of the primary structure shall be <br />surveyed and verified as being in conformance to the approved building heights. <br />Said verification is the project developer's responsibility. <br />46. Prior to receiving a foundation inspection for the structure, the applicant shall <br />submit a pad elevation certification prepared by a licensed land surveyor or <br />registered civil engineer to the Chief Building Official and Planning Director, <br />certifying that the pad elevations and building locations (setbacks) are pursuant <br />to the approved plans. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.