Laserfiche WebLink
Exhibit "B" <br />REIMBURSEMENT AGREEMENT WITH SUMMERHILL ROSE LTD. FOR 16" WATER MAIN <br />NOLAN FARMS -TRACK # 7143 <br />PLEASANTON,CA <br /> Per Meetiu on Moods , Au st 27,2001 <br />nasclvrrtox 1J1VIT TY U1vI1' COS TOTAL <br />.....:... .....::::.....:.::......:...:::v::~v..:..\:::::........................... x:::....... <br />16" PVC WATER LF 587 S sa.oo S a9 os.00 <br />16" D.I.P WATER LF zo s sl.oo S 16zo.oo <br />2" WATER SEVICES EA o S S <br />1" WATER SERVICES EA 0 S S - <br />CONNECT TO EXISTING MAIN EA 0 S 5 00.00 S <br />12" D.I.P OFF SET EA o S - S <br />16" D.I.P OFF SET EA 1 S s 20.00 S s 20.00 <br />FIRE HYDRANT ASSEMBLY EA 0 1 - S <br />FIRE HYDRANTS EA o S S <br />BLOW OFF EA o S S <br />AIR VALVE EA o S - S <br />INSTALL & REMOVE JUMPERS EA o S S <br />TESTING NEW WATER LINE LF 527 S 2.00 S 1 054.00 <br />SAW CUT EXISTING PAYMENT , OFFHAUL SPOILS , <br />REPLACING EXISTING PAVEMENT WITH NEW AND <br />CLEAN UP <br /> <br />LS <br /> <br />1 <br /> <br />S 8,000.00 <br /> <br />S 9,000.00 <br />TOTAL OFFSITE S 68,302.00 <br /> Per Meetiu oo Monda , Au st 27,2001 <br />DESCRIPTION il1V1T QTY i11VIT co TOTAL <br /> <br />8" PVC C-900 CI 150 LF 1677 S 25.50 S 4Z 763.50 <br />16" PVC WATER LF 1641 S 69.00 S 113 29.00 <br />16" D.I.P WATER LF 269 S 81.00 S 21789.00 <br />2" WATER SEVICES EA o S S <br />2" TEMPORARY WATER LINE LF a2o S a7.oo S 197ao.oo <br />1" WATER SERVICE IN EX. PAVE FA 0 S S <br />1" WATER SERVICES EA 0 S S <br />1" WATER SERVICE TO EXISTING HOMES EA 5 S 2,000.00 S to 000.00 <br />CONNECT TO EXISTING MAIN EA o S S <br />FIRE HYDRANT ASSEMBLY EA o S S <br />FIRE HYDRANTS EA o S <br />BLOW OFF EA o S <br />AIR VALVE EA o S <br />INSTALL 8 REMOVE JUMPERS EA o S S - <br />TESTING NEW WATER LINE LF z33 S 2.00 S 466.00 <br />BUILD 8" OFFSET AND RE-DUE ORIGIONAL FITTINGS <br />ON CREEK TRAIL <br />LS <br />1 <br />S 2,SOO.00 <br />S 2,500.00 <br />TOTAL ONSITE S 124,960.50 <br /> Per Meetiu ou Monda , Au at 27,2001 <br />DESCRIPTION iJN1T QTY i7N1T cos TOTAL <br /> <br />16" Water line tie-in ar Rose lane and Stony Brook lane and <br />abandon tempoeary 2" water line on Rose lane <br />LS <br />1 <br />S 6,903.48 <br />S 6,903.48 <br />Changes made by City and hydrant added to Rose lane LS 1 S - S <br />Chlorinated and flushed 16" water line on Rose lane LS 1 S 1,076.55 S 1,076.55 <br />Tested 16" water line on Rose lane LS 1 S 1,159.93 S 1,159.93 <br />Observation and testing of backfill material for the 16" water <br />main on Rose Ave. <br />LS <br />i <br />S 2,5oa.00 <br />S 2,SOa.00 <br />RJA Cost associated design of 16" water through the Nolan <br />Farms pro ect <br />LS <br />1 <br />S 9,484.50 <br />S 9 484.50 <br />TOTAL ADDITIONAL COST <br />$ 21,128.46 <br />RNMUSMnM Ap"wnM h" wpam"h EM"ncMnM <br />1Wf <br />