Laserfiche WebLink
Bernal Community Park -Planned Facilities by Phase <br />Phase III <br />^ 16.75 acres overall development size <br />^ Senior league lighted baseball diamond with built-in bleacher seating <br />^ One (1) lighted soccer field <br />^ Large group picnic pavilion (overhead shade structure and perhaps 24 tables with <br />food prep area) <br />^ Public restroom building (800 S.F.) <br />^ 1,000 seat amphitheater <br />^ A.C. paved parking lot - 78 spaces <br />^ Completion of Pleasanton Avenue from Phase 1 terminus to Bernal Avenue <br />(approximately 2,200 L.F.) <br />^ Completion of "plaza" architectural elements, including: three (3) announcer's <br />booths, two (2) concessions buildings (600 S.F. each) and architectural shade <br />structures. <br />^ Approximately two (2) acres of ornamental landscape plantings <br />^ Lighted concrete pathways <br />Phase IV <br />^ 5.5 acres overall development size <br />^ One (1) lighted football/lacrosse field <br />^ A.C. paved parking lot - 22 spaces <br />^ Approximately'/z acre of ornamental landscaping <br />^ Lighted pedestrian bike paths <br />^ Dumpster enclosure <br />Capital Cost <br />The City has estimated construction costs based on the above descriptions of the <br />improvements to be $10.8 million. <br />Estimated Annual Maintenance and Operating Costs <br />The tables below present the estimated anmial maintenance and operating costs for <br />Bernal Community Park -Phase III and Phase IV <br />