My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
110607
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2007 3:06:42 PM
Creation date
11/1/2007 2:15:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
11/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. On-site parking is only allowed in the garages (for Homes A-D) and in the two <br />designated parking spots for the existing home. Parking is prohibited anywhere <br />within the joint-access driveway. Moving, delivery, and any other type of service <br />vehicle must either park in the home's garage or designated parking spot, or park <br />off-site. <br />11. Prior to the demolition of any existing structure(s) located on the property, the <br />applicant shall have the structures examined for the presence of lead, lead-based <br />paint, and/or asbestos by a qualified environmental professional. If lead and/or <br />asbestos are found to be present, demolition of these structures shall be <br />conducted in accordance with the applicable requirements of the California <br />Department of Industrial Relations (Cal-OSHA) for lead, and Cal OSHA and the <br />Bay Area Air Quality Management Board (BAAQMD for asbestos. The applicant <br />shall provide to the Planning Director afollow-up report within 30-days after <br />demolition of the structure(s) is completed. <br />12. Prior to the issuance of a building permit, the project developer shall submit <br />details and/or a spec sheet of the proposed exterior doors to the Planning <br />Department for review and approval by the Planning Director. <br />13. Only gas fireplaces, pellet fueled wood heaters or EPA certified wood-burning <br />appliances may be installed in new or renovated homes. <br />14. All residences in the PUD shall be constructed to allow for future installation of a <br />Photovoltaic (PV) system. The project/ building developer shall comply with the <br />following requirements for making all houses on the property photovoltaic ready. <br />Making the home photovoltaic ready shall require the following measures to be <br />implemented with the construction of the structures covered: <br />1. Electrical conduit and cable pull strings shall be installed from the <br />roof/attic area to the buildings' main electrical panels. <br />3 <br />^ ^ ^ Permitted Location for 8-foot maximum height fence <br />
The URL can be used to link to this page
Your browser does not support the video tag.