Laserfiche WebLink
08/08/02 10:48 FAX 925 184 8234 <br />CITY - PLEASANTON Q006/022 <br />Financing Program #2. Upon approval of a tentative map, the City may allow partial <br />infrastructure extensions within Parts 1, 2, and 3 if: <br />(a) <br />(b) <br />the Lot to be developed would be fully served with all planned <br />infrastructure extended from the westerly end of the Plan Area and <br />the total Specific Plan fees generated by the Lot to be developed are <br />insufficient, when aggregated with monies in the Specific Plan fund. to <br />allow all infrastructure required in that sub -area to be fully installed. <br />Example 2 A. Lot 10 is the first lot wishing to develop. It must extend the Part 1 <br />infrastructure from the westerly end of the Plan Area across its frontage. Lot <br />10's four units do not generate funds sufficient to extend the infrastructure further <br />(there being no existing Specific Plan funds). The Part 1 sewer and roadway <br />improvements may stop at Lot 10 and need not be installed easterly to Lot 15. the <br />easterly edge of the Part 1 sub -area. <br />The elementary school (located at the westerly edge of the Part 4 sub -area on Lot 19) is a <br />key element of the Specific Plan whose early development is encouraged. Should the <br />school seek to develop prior to Parts 1-4 private development. it will require some, but <br />not all, of the infrastructure required of other Part 4 projects. <br />Financing Program #3. Development of the elementary school may proceed <br />independently of any other development in the Plan Area with a minimum level of shared <br />infrastructure improvements. The City may coordinate with the School District by using <br />its utility enterprise capital improvement funds to assist in installing the minimum level <br />of infrastructure. Both the School District and the City would be eligible for <br />reimbursement as described in Financing Program #20. Minimal improvements required <br />are: <br />(a) Construction of the 16 -inch water trunk line in the existing Vineyard <br />Avenue, and Zone 7 Turn-out #6 modifications; <br />(b) Construction of all shared sanitary sewer improvements west of the school <br />site, or, on a temporary basis, installation of an on -site sewage holding <br />tank; <br />(c) Realignment of Vineyard Avenue from Lot 15 to the eastern Plan Area <br />boundary; and <br />(d) Construction of a sidewalk along the south side of Vineyard Avenue from <br />Lot 1 to its intersection with the abandoned old Vineyard Avenue. <br />3 <br />