My WebLink
|
Help
|
About
|
Sign Out
HEARTWOOD COMMUNITIES
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
H
>
HEARTWOOD COMMUNITIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2007 10:44:52 AM
Creation date
10/24/2007 9:49:44 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/5/2006
LONG TERM AGREEMENTS - NAME
HEARTWOOD COMMUNITIES
LONG TERM AGREEMENTS - TYPE
SUBDIVISION AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Time of Essence. Time is of the essence in the performance of this <br />Agreement. The work and improvements required by this Agreement to be completed by <br />Subdivider shall be completed within two (2) years from the above-mentioned date of <br />this Agreement. <br />The City may extend the time for completion of improvements hereunder, upon <br />good cause being shown by the Subdivider. Any such extension may be granted without <br />notice to the Subdivider's surety, any extension so granted shall not relieve the surety's <br />liability on the bond to secure the faithful performance of this Agreement. <br />2. Work. Subdivider will do or cause to be done and performed the <br />following described work: Improvements pursuant to plans and project bond estimates <br />entitled <br />"a)Improvement Plans, Tract 7162, HEARTWOOD COMMUNITIES ,Pleasanton, <br />California dated April, 2006 and Bond Estimate for Tract 7162-HEARTWOOD <br />COMMUNITIES ,dated April, 2006 and subsequent revisions to plans' prepared by <br />Cunha Engineering Inc and approved by the City Engineer and <br />b)Landscaping, Irrigation, Joint Trench and Street Lighting Plans, Tract 7162, <br />HEARTWOOD COMMUNITIES ,Pleasanton, California <br />3. Inspection. City shall inspect all of said work through an inspector <br />employed by City at the cost and expense of Subdivider, and Subdivider shall pay City <br />the cost of such inspection as fixed by Ordinance. <br />The City Engineer has tentatively fixed the inspection costs due upon execution of <br />this agreement as follows: <br />$40,940.00 <br />4. Soils ReQort. Subdivider shall provide a preliminary soils report as <br />required by Section 66490 of the Government Code. Said data shall be compiled by a <br />qualified soils testing engineer without expense to the City. <br />5. Plans. All of said work shall be done and materials furnished in strict <br />accordance with the approved plans for said tract filed with the City Engineer, and in <br />accordance with the standard specifications and details of the City of Pleasanton. It is <br />further understood that the work and materials shall be under the supervision of the City <br />Engineer, and performed and installed to his satisfaction. <br />6. Related Contracts and Proceedings. Any prior contracts between City and <br />Subdivider and any prior approvals by Boards, Commissions or Council of City shall not <br />be affected by the provisions of this Agreement unless specific modification is set forth <br />herein. <br />SUBDIVISION AGREEMENT <br />TRACT NO. 7162, "HEARTWOOD COMMUNITIES " <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.