My WebLink
|
Help
|
About
|
Sign Out
RES 07152
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2007
>
RES 07152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2007 1:25:27 PM
Creation date
10/17/2007 1:25:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/2/2007
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 07152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Overriding Considerations. <br />As explained in greater detail in the Statement of Overriding Considerations below, the <br />environmental, economic, social and other benefits of the Environmentally Superior <br />Project override any remaining significant adverse impacts of the project resulting from <br />cumulative traffic impacts. <br />VII. Findings and Statement of Overriding Consideration <br />Pursuant to Public Resources Code section 21081 and CEQA Guidelines <br />Section 15093, this City adopts and makes the following Statement of Overriding <br />Considerations regarding: (1) the significant and unavoidable impacts from the <br />cumulative increase in traffic under the Environmentally Superior Project which would <br />contribute to unsatisfactory levels of service at the Bernal Avenue/I-680 South Bound <br />on-ramp and at the Santa Rita RoadNalley Avenue intersection; and (2) the significant <br />and unavoidable impact from the cumulative loss of blue oak woodlands under the <br />Environmentally Superior Project which would contribute to loss in the spatial continuity <br />of the plant community,. <br />The City finds and determines that all but two of the significant impacts of the <br />Environmentally Superior Project will be reduced to acceptable levels by the mitigation <br />measures recommended in these Findings. However, as set forth above, the City's <br />approval of the Environmentally Superior Project as proposed will result in two <br />significant adverse environmental cumulative traffic effects that cannot be avoided even <br />with the incorporation of all feasible mitigation. The City chooses to approve the <br />Environmentally Superior Project because, in its view, the benefits resulting from the <br />Environmentally Superior Project will render the significant effects acceptable. <br />The following statement identifies the reasons why, in the City's judgment, the benefits <br />of the Environmentally Superior Project outweigh the two significant and unavoidable <br />impacts. The substantial evidence supporting the enumerated benefits of the <br />Environmentally Superior Project can be found in these findings, in the Environmentally <br />Superior Project itself, and in the record of proceedings. Each of the overriding <br />considerations set forth below constitute a separate and independent ground for <br />findings that the benefits of the Environmentally Superior Project outweigh its two <br />significant adverse environmental effects and is an overriding consideration warranting <br />approval. <br />The City finds that the Environmentally Superior Project, as approved, would have the <br />following benefits: <br />1. Require the dedication of four hundred ninety-seven (497) acres as permanent <br />open space for community benefit; <br />Page 43 of 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.