Laserfiche WebLink
SCOPE OF SERVICES <br /> <br />We understand that CH2M Hill is the geotechnical engineer-of- <br />record for the project for which we have been asked to serve as <br />the testing laboratory. The project schedule is at this time not <br />complete; however, the density testing operations are anticipated <br />to take 8 months. During this time, BSK will be retained to <br />perform soil density testing and concrete cylinder testing under <br />the auspices of members of the CH2M Hill staff. The method and <br />frequency of such testing will be performed in accordance with <br />the project plans and specifications, as directed by CH2M Hill <br />staff. <br /> <br />Soil samples will be obtained for moisture-density relationships <br />in accordance with specifications. Trench backfill and mass <br />grading soils will be tested on an intermittent basis throughout <br />the construction. <br /> <br />Results of field observation and construction will be presented <br />to you in monthly summary reports reviewed and signed by a <br />registered Civil Engineer. You would be notified of any observed <br />discrepancies between test and observation results and those <br />required by project plans and specifications. Copies of reports <br />and testing would be provided to governmental agencies upon <br />request. <br /> <br /> <br />