Laserfiche WebLink
'. <br />H. DELEGATION OF MAINTENANCE: <br />The specific maintenance function indicated below on is hereby <br />delegated to the CITY. This delegation of maintenance function set <br />forth herein does not include areas and functions of which the control <br />and maintenance rest with the local authority under the terms of <br />Freeway Agreements and/or Freeway Maintenance Agreements. <br />MAXIMUM <br />ANNUAL <br />ROUTE LENGTH PROGRAM AUTHORIZED <br />N0. MILES DESCRIPTION OF ROUTING DELEGATED EXPENDITURE <br />580 4.47 Freeway, from east city None <br />limits 2,970 feet west of <br />E1 Charro Overcrossing to <br />west of San Ramon Road <br />Overcrossing, a length of <br />4.47 miles. <br />680 4.06 Freeway, from south city HM4K <br />limits at Happy Valley <br />Road to the city limits <br />at the Southern Pacific <br />Railroad, a length of 0.58 <br />mile for this portion; <br />also, freeway, from the <br />city limits at the south- <br />west right of way line of <br />Western Pacific Railroad <br />to the City limits 250 ft. <br />northeast of the southwest <br />right of way line of the <br />Western Pacific Railroad, <br />a length of 0.05 mile for <br />this portion; also, freeway, <br />from city limits at Bernal <br />Avenue to north city limits <br />at intersection with Route <br />580, a length of 3.44 miles <br />for this portion; a total <br />length of 4.06 miles. <br />0.00 <br />$10,000.00 <br />Total Authorized Route 680 $10,000.00 <br />STATE facilities maintained by the CITY. <br />State Share <br />680 Stoneridge Interchange NB ramp signals 50~ <br />2-310 HPS lights 50$ <br />SB ramp signals 50~ <br />2-310 HPS lights 50~ <br />-6- <br />