My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
101607
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2007 12:55:42 PM
Creation date
10/11/2007 12:55:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Engineer and/or the Chief Building and Safety Official as applicable. The <br />CC&Rs covering Lots 1 through 51 shall include this statement. <br />e. Prior to grading permit issuance the project developer shall submit a copy of <br />the State Water Resources Control Board Notice of Intent (NOI) for coverage <br />under the State Construction Storm Water General Permit for projects with <br />clearing, grading and excavation exceeding the current thresholds. <br />f. All metal roofs shall be finished with rust-inhibitive paint. The CC&Rs <br />covering Lots 1 through 51 shall include this statement. <br />g. Unless otherwise approved by the City Engineer, the roof drains for all <br />existing and future primary and accessory structures on Lots 1 through 51 <br />shall be connected to the development's storm drain system. The CC&Rs <br />covering Lots 1 through 51 shall include this statement. <br />Urban Stormwater Construction Requirements <br />~-1-83. To address the potential degradation of water quality in nearby surface water <br />bodies by urban stormwater runoff from construction activities and <br />post-construction land uses, the project developer and future lot owners/ <br />contractors shall submit a Stormwater Pollution Prevention Plan (SWPPP) for <br />review and approval by the City Engineer prior to issuance of grading permits for <br />the subdivision and then building/grading permits for the individual lots. Failure <br />to comply with the approved construction SWPPP may result in the issuance of <br />correction notices, citations or stop work order. The following construction Best <br />Management Practices (BMPs), as well as any other applicable measure, shall <br />be included in the SWPPP and implemented as approved by the City Engineer. <br />(Mitigation Measures H-2-a and G-1 of the FEIR.) <br />~?84. The project developer for the construction of the subdivision, the lot <br />owner/contractor for the construction of homes on the individual lots, and then <br />the homeowner after building occupancy are responsible for implementing the <br />following measures during all construction phases of the project and the lots <br />covered by this approval: (Mitigation Measures H-2-a and G-1 of the FEIR.) <br />a. Include erosion control/storm water quality measures on the final grading plan <br />which shall specifically address measures to prevent soil, dirt, and debris from <br />entering the storm drain system. Such measures may include, but are not <br />limited to, hydroseeding, hay bales, sandbags, and siltation fences and are <br />subject to the review and approval of the City Engineer and/or the Chief <br />Building and Safety Official as applicable. The project developer and the lot <br />owner/contractor are responsible for ensuring that their contractors and sub- <br />contractors are aware of and implement these measures. <br />b. All graded lots shall be revegetated and stabilized after completion of grading, <br />but in no case later than October 15th. The hydroseed mixture shall consist of <br />the following species and rate-of-cover: crimson clover (20.0 Ibs/acre), <br />City Council October 2. 2007 Page 35 of 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.