Laserfiche WebLink
g michael goldsworthy <br /> ' 'architect aia <br /> 78 mission drive, sut~ b · pl~asanton. california 94~66 <br /> (415) 4.6~-0500 <br /> <br /> July 21, 1987 <br /> Revised July 24, 1987 <br /> <br /> Mr. Brian Swift <br /> Director of Planning <br /> and Community Development <br /> City of Pleasanton <br /> 200 Old Bernal Avenue <br /> Pleasanton, CA 94'566 <br /> <br /> Re.' Interior Remodel <br /> City of Pleasanton Offices <br /> and 123 Main Street Building <br /> Pleasanton, California <br /> <br /> Dear Brian .' <br /> <br /> In accordance with our previous discussions, we are please~- to <br /> submit our fee to prepare the necessary design and construction <br /> drawings for the subject project based on your direction. <br /> <br /> Our fee to prepare .'the necessary work shall be= <br /> Architectural Design ............... $ 5,500. <br /> Architectural Construction Drawings ........ 7,500. <br /> <br /> Electrical Modifications (Power, Telephone, <br /> Lighting ) ................... 2,500.. <br /> <br /> BVAC Modifications ................ 2,000. <br /> Construction Services ............... 2 t 000. <br /> <br /> Work not included: <br /> <br /> 1. Structural revisions (if required, will be invoiced <br /> separately ). <br /> <br /> 2. Title 24 calculation's (Form S included in construction <br /> drawings portion ). <br /> <br /> <br />