Laserfiche WebLink
<br />, <br /> -EXHIBIT B <br /> Connection Charges <br />S umma rv <br /> Connection <br />Property... Frontage.., %** Charge ** <br />I. Lamoste 75' 3.6 $..1,090.69 <br /> (946-1.109-2) <br />2. Regasa 138' 6.7 2,4Q6.88 <br /> -(946-1109-1) <br />3. Morici & Pons" 389' 18.7 5,657.05 <br /> (946-3200-4-3) <br />4> Morici 810' '38.9 11,779.48 <br /> (946-3200-3) <br />5. Spivak Dev. Co. 269' 12.9 3,91.1.95 <br /> c/o Standard Oil <br /> (946-1100-15) <br /> l each - 6 °' butterf3y .valve and tie 526.32 <br /> 4,438.27 <br />6. Glaser 100' 4.8 1,454.25 <br /> (946-.1100-4) <br />7. First Pleasanton <br /> Investors - 299' 14.4 `4,32$.22 <br /> (946-1100-16-1) <br /> 1 each - #76 Fire hydrant .assembly 1,368>42 <br /> 5,696.64 <br /> Totals *2080' 100.0 $32,143.26 <br /> Total front -footage <br />** % (percent) of total front `footage <br />*** Total connection charges, not including nteres <br /> Engineering $ 1,590.60 <br /> City Fees 721.10 <br /> Construction (common) 26.,425.00 <br /> City Administrative Costs 1,512.42 <br /> Total cost used for spread. $30,248.52 <br /> .Construction (individual) <br /> #5 $ 526.32 <br /> 7 1,368.42 <br /> Total connection charge $32,143.26 <br />NOTE: Interest in .the amount of six percent annually shall `be <br /> added. to connection charges collected of per January 1, 1976 . <br />