My WebLink
|
Help
|
About
|
Sign Out
RES 87498
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87498
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 10:42:12 AM
Creation date
12/7/1999 12:48:55 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/17/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I'lr. Michael Fulford <br />October 6, 1987 <br />Page 2 <br /> <br /> I. Roadway and Parkina Lots <br /> Prepare construction documents at 20' scale. This shall Include the following: <br /> 1, Existing Conditions Plan based upon new survey Information. <br /> Z. Conceptual 6radlng and I)ralnage Ran for roadway, parking lots and <br /> sports fields. <br /> :~. Irrigation Relocatton Plan <br /> 4. Planting Ran <br /> 5. Irrigation and Ranting Details <br /> 6, Irrigation and Planting Specifications <br /> J. Prepare final overall cost estimate for roadway, parking Iot~ Including <br /> landscape modifications. <br /> K. Bike Path/Soccer Pads <br /> Prepare construction documents as a separate bid package from that <br /> described above for the roadway and parking 1ors. This work shall be <br /> performed In a timely manner In order to begin construction by March <br /> 1,1988. The work shall Include the following: <br /> 1. Layout Plan on 100' scale aerial <br /> Schematic 6fading and Drainage Plan. This shall Include an on-site walk <br /> through with the City Landscape Architect to verify layout of path and <br /> pads In relatlon to existing grades and Irrigation modifications. <br /> 3.Irrigation Relocation Plan <br /> 4,Planting Plan <br /> 5.Details and Specifications as necessary <br /> L. Prepare final cost estimate for bike path. <br /> <br />II. Ruth & Golna Inc.'s SCODe Of Work <br /> <br /> A. Collect background Information Including existing utility Information, provide <br /> 20' scale aerial survey of the work area and field check existing utilities, <br /> B. Attend one (1) meeting at CIty Hall with the Parks and Recreation Commission <br /> and two (Z) meeting with City Staff. <br /> C. Assist AKA In layout of roadway and parking lots and generate necessary <br /> geometrlcs for construction documents. <br /> D. Prepare preliminary cost estimate with detailed cost breakdown for the <br /> work outlined below, <br /> E. After approval of preliminary design of roadway and parking lot, prepare <br /> construction documents for the following: <br /> I. Demolition Ran <br /> Z. Final Grading and Drainage Plan <br /> 3. Staking and Layout Plan ( Dimensions and CIty Standards shall be provided <br /> to Ruth & Going) <br /> 4.Striping Plan <br /> 5.Hardscape and Drainage Details <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.