My WebLink
|
Help
|
About
|
Sign Out
PC 2006-37
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2006
>
PC 2006-37
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:31 AM
Creation date
10/2/2007 10:51:29 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/12/2006
DOCUMENT NO
PC 2006-37
DOCUMENT NAME
PDR-458 / PV-152
NOTES
NORMAN CORNETT / PEAK PROPERTY MAIN ST
NOTES 2
CONSTRUCT 3,896SQ FT & VARIANCE PARKING
NOTES 3
600 MAIN ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a) The project developer shall include erosion control/storm water quality measures on <br />the building permit plans which shall specifically address measures to prevent soil, <br />dirt, and debris from entering the storm drain system. Such measures may include, <br />but are not limited to, hydroseeding, hay bales, sandbags, and siltation fences and are <br />subject to the review and approval of the City Engineer/Director of Building <br />Inspection. The project developer is responsible for ensuring that the contractor is <br />aware of and implements such measures. <br />b) Gather all construction debris on a regular basis and place it in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to storm <br />water runoff pollution. <br />c) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site and <br />place gravel on them. Do not drive vehicles and equipment off paved or graveled <br />areas during wet weather. Broom sweep the street pavement adjoining the project site <br />on a daily basis. Scrape caked-on mud and dirt from these areas before sweeping. <br />d) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing in the storm drain system. Maintain and/or replace filter materials to ensure <br />effectiveness and to prevent street flooding. <br />e) Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being windblown or <br />in the event of a material spill. <br />f) Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br />g) Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br />discharge wash water into street, gutters, or storm drains. <br />{endJ <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.