My WebLink
|
Help
|
About
|
Sign Out
PC 2006-28
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2006
>
PC 2006-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:31 AM
Creation date
10/2/2007 10:32:33 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/24/2006
DOCUMENT NO
PC 2006-28
DOCUMENT NAME
PUD-54
NOTES
GREG REZNICK, THREEHAND LP
NOTES 2
SUBDIVIDE 20-ACRES INTO 8 LOTS
NOTES 3
5 WINDY OAKS DR (1680 VINEYARD)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
security watchman's living quarters during the construction of the subdivision <br />improvements. At no time shall campers, trailers, motor homes, or any other <br />vehicle be used as living or sleeping quarters on the construction site. All such <br />vehicles shall be removed from the site at the end of each workday. <br />35. Dust and mud shall be contained within the boundaries of the property during <br />times of construction. The project developer shall submit a dust control plan or <br />procedure as part of the improvement plans. <br />36. The project developer shall submit a waste generation disposal and diversion plan <br />to the Planning Department prior to construction. The plan shall include the <br />estimated composition and quantities of waste to be generated and how the project <br />developer shall recycle at least fifty percent (50%) of the job site construction and <br />demolition waste. Proof of compliance shall be provided to the Planning Director <br />prior to final inspection. During demolition and construction, the project <br />developer shall mark all trash disposal bins "trash materials only" and all <br />recycling bins "recycling materials only". The project developer shall contact <br />Pleasanton Garbage Service for all waste disposal. Only that portion of trash and <br />recycling waste refused by Pleasanton Garbage Service shall be disposed of or <br />diverted by another trash/recycling company. <br />37. If any prehistoric or historic artifacts, or other indications of cultural resources are <br />found once the project construction is underway, all work must stop within 20 <br />meters (66 feet) of the find. A qualified archaeologist shall be consulted for an <br />immediate evaluation of the find prior to resuming groundbreaking construction <br />activities within 20 meters of the find. If the find is determined to be an important <br />archaeological resource, the resource shall be either avoided, if feasible, or <br />recovered consistent with the requirements of Appendix K of the State CEQA <br />Guidelines. In the event of discovery or recognition of any human remains in any <br />on-site location, there shall be no further excavation or disturbance of the site or <br />any nearby area reasonably suspected to overlie adjacent remains until the County <br />coroner has determined, in accordance with any law concerning investigation of <br />the circumstances, the manner and cause of death and has made recommendations <br />concerning treatment and dispositions of the human remains to the person <br />responsible for the excavation, or to his/her authorized representative. A similar <br />note shall appear on the improvement plans. <br />38. Portable toilets used during construction shall be kept as far as possible from <br />existing residences and shall be emptied on a regular basis as necessary to prevent <br />odor. <br />39. Except as otherwise specifically addressed in these conditions of approval, the <br />applicable construction stage mitigation measures included in Section IVF of the <br />Vineyard Avenue Corridor Specific Plan (pp. 48-56) shall be incorporated herein <br />and shall be followed as the project develops. <br />
The URL can be used to link to this page
Your browser does not support the video tag.