My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENT 8
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
100207
>
11 ATTACHMENT 8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2007 12:31:47 PM
Creation date
9/25/2007 1:56:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/2/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENT 8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
houses are screened. She noted that a house is visible where the vegetation ends, and this <br />might be a place where maybe more mitigation trees might be needed. <br />Ms. Mundie pointed out that these visual simulations are of assistance in a number of <br />different ways, the most important of which are to give decision-makers an idea of what the <br />completed project will look like, and then to give the EIR team one measure of determining <br />whether there are significant aesthetic impacts associated with the project. She added that, in <br />fact, Chapter 4, Part A did find significant impacts associated with the aesthetics and visual <br />resources: In Impact A-1, public uses and facilities, including new roads, need to be <br />integrated into the surrounding landscape, primarily by landscape and plantings. It is <br />recommended that the mandatory design guidelines be revised to put more lots into the <br />category of "high visibility," which would have the effect of placing more restrictive <br />setbacks and landscape requirements on all the lots that would be added to this group. <br />Ms. Mundie then noted that no adverse impacts were found in the case of agriculture. She <br />added that in the case of air quality, the methodology, the information, and the analysis are <br />determined by regional agencies and that the regional criteria established by the Bay Area <br />Air Management Quality Agency were observed. Because the project was too small for the <br />other impacts, only one impact was found related to those criteria to reach those thresholds: <br />that on dust generation primarily during construction. An impact mitigation program was <br />recommended to deal with that. <br />Ms. Mundie continued that Section D, the second large section of Chapter 4, is biology. It <br />includes a series of graphics showing biological resources associated with the site, among <br />them ponds, wetlands, plant communities, and substantial wooded areas on the site. There <br />are approximately 12,000 trees on this site at the present time, and about 950 trees would be <br />removed of which about 90 would be trees that meet Pleasanton's heritage tree standards. <br />She noted that the ponds are potential breeding habitats for the California Red-Legged Frog, <br />which, together with the California Tiger Salamander, has been found on the site in <br />association with these ponds. In addition, a certain plant called the Johnny Jump-up, or the <br />viola cornuta, grows in the area. This plant serves as the host plant for the Callippe <br />Silverspot butterfly in its larval stage, so these plant areas are a very important part of the life <br />cycle of that endangered species and an important biological resource of the site. <br />Ms. Mundie noted that the biological section found ten biological resources and proposed <br />extensive mitigations for all of them, which are reported in the Draft EIR. <br />Chairperson Arkin inquired how the biological assessment was done and if the consultants did <br />the assessment themselves or hired someone to do it. <br />Ms. Mundie replied that they worked closely with specialists with several of the technical areas. <br />She added that they used the services of a firm called Environmental Vision in Berkeley in the <br />aesthetic area. The firm prepared the visual simulations, and higher quality reproductions of <br />these visual simulations are available at a larger size, which will be provided to the Commission. <br />Ms. Mundie continued that in the biology area, they worked with the firm WRA Incorporated in <br />San Rafael. WRA's technique was, first of all, to use the information bases that are available to <br />let biologists know where on a site of any kind they would be likely to find resources if they <br />EXCERPTS: PLANNING COMMISSION MINUTES, July 12, 2006 Page 7 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.