My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENT 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
100207
>
11 ATTACHMENT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2007 12:32:40 PM
Creation date
9/25/2007 1:23:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/2/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENT 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of approval, the development agreement, or prior to issuance of any City <br />construction permits. Owners of residential lots shall pay all applicable building <br />permit fees for the individual lots at the time of issuance of building permit(s). <br />The type and amount of the fees shall be those set forth in these conditions, in <br />the development agreement, or in effect at the time the fees are otherwise paid. <br />6. All conditions of approval for this development plan shall be reprinted and <br />included as a plan sheet(s) with the improvement plan check sets including <br />grading, construction, and landscaping plans, which shall be kept on the project <br />site at all times. The applicant may request these conditions of approval be <br />attached to the plan set as a separate document which he/she is responsible for <br />obtaining and ensuring the conditions are securely attached. Prior approval from <br />the Planning Director is required before any changes are constituted in site <br />design, grading, etc. It is the responsibility of the project developer to ensure that <br />the project contractors are aware of, and abide by, the approved plans and all <br />conditions of approval. <br />7. This development plan shall be of no further validity and the project developer <br />shall be required to submit the same or new development plan for City approval <br />prior to development of the site in the event that the project developer fails to <br />record a final subdivision map within five years of PUD approval. <br />Air Quality <br />8. To address the potential impacts on sensitive receptors to pollutant <br />concentrations resulting from grading, a dust control plan or procedure shall be <br />submitted by the project developer with the subdivision's improvement plans <br />before recordation of the final subdivision map er and by the lot owner/contractor <br />with the grading plans for the individual home sites. The dust control plan shall <br />include the applicable conditions of this approval, the appropriate dust control <br />measures of the Bay Area Air Quality Management District (BAAQMD), and shall <br />be subject to the review and approval by the Planning Director and the City <br />Engineer. These conditions and measures shall be reflected in the construction <br />contracts issued for the grading and site preparation. A modified form of this <br />statement shall appear in the design guidelines. (Mitigation Measure C-1 of the <br />FEIR.) <br />Biological Mitigation Measures <br />9. The project developer shall retain qualified biologists to prepare and submit the <br />following biological reports/analyses and/or plans before the first final subdivision <br />map application for review and approval by the Planning Director and by the <br />United States Fish and Wildlife Service (USFWS), prior to the City Council's <br />action on the first final subdivision map: <br />a. To address the potential significant impact on California tiger salamander <br />populations due to the disturbance or removal of their upland or dispersal <br />Page 2 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.