Laserfiche WebLink
Section 3.04(c) of the Development Agreement shall be revised to read as follows: <br />Developer shall dedicate land for, and construct, fire access roads as shown on the Oak Grove Planned <br />Unit Development Plan or in such other location (or locations) as reasonably acceptable to the City. <br />The dedication shall occur with the recordation of the fast final map for the Project. One fire access <br />road will extend to the existing water tank within the Kottinger Ranch subdivision and will be <br />composed of crushed granite of other similar materials capable of supporting a type 3 fire vehicle. The <br />other fire access road will connect to the City's existing access easement (as said easement may be <br />relocated) within the Grey Eagle Estates subdivision. This latter fire access road will involve <br />improving an existing access and public service easement and will connect the cul de sac of Grey <br />Eagle Court to the Project property line as follows: From the cul de sac, the existing improvements <br />(which extend about 130 feet) shall remain as constructed; from the end of those improvements, the <br />easement may be relocated to accommodate a proposed driveway and residence on the Roberts' <br />property. This relocated easement shall serve, in part, as a driveway to the proposed Roberts' <br />residence. This portion of the easement, the location of which must be acceptable to the City and <br />Roberts, shall be 20 feet wide and be an all weather surface to the extent it serves as a driveway. <br />Developer shall bear the incremental cost to increase the width of the driveway from 14 feet to 20 feet. <br />The remaining portion of the easement (about 120 feet in length) that connects the easement/driveway <br />