My WebLink
|
Help
|
About
|
Sign Out
PC-88- 90
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1988
>
PC-88- 90
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:35:22 AM
Creation date
9/25/2007 11:45:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/10/1988
DOCUMENT NO
PC-88-90
DOCUMENT NAME
TRACT 5801
NOTES
HARRY AND ROBERTA CADWELL
NOTES 2
SUBDIVIDE APPROX 2.0 ACRE SITE INTO 13 PARCELS FOR SINGLE-FAMILY RESIDENTIAL UNITS
NOTES 3
3745 VINEYARD AVENUE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Engineer for temporary use of an existing well for construction <br />water. <br />Any wells designated for abandonment or any wells encountered <br />during construction, are to be destroyed in accordance with a <br />permit obtained from Zone 7 by calling (415) 443-9300. <br />That the haul route for all materials to and from this <br />development be approved by the City Engineer prior to the start <br />of any construction. <br />That the developer submit an erosion and sedimentation control <br />plan or procedure as part of the improvement plans prior to the <br />final approval of the development. <br />That the developer submit a dust control plan or procedure as <br />part of the improvement plans prior to the final approval of the <br />development. <br />That storm drainage swales, gutters, inlets, outfalls, and <br />channels not within the area of a dedicated public street or <br />public service easement approved by the City Engineer be <br />privately maintained by the property owners or through an <br />association approved by the City. <br />That approval of the water supply and distribution system be <br />withheld pending final design and until the developer has <br />demonstrated to the satisfaction of the City Engineer that the <br />proposed system meets both the immediate and long-range <br />requirements for supplying water in this area. <br />That the developer comply with any and all applicable <br />requirements of the cross-connections control and backflow <br />prevention device programs required by the California <br />Administrative Code, Title 17. <br />That the developer pay the applicable Zone 7 and City connection <br />fees and the meter cost prior to Council approval of the <br />development for any water meters (irrigation meters) not directly <br />related to a building permit. <br />That approval for the number, type and location of fire hydrants <br />be withheld pending final design, review by the Fire Marshal, and <br />final review by the City Engineer. <br />That approval of the sanitary sewer system be withheld pending <br />final design and until the developer has demonstrated to the <br />satisfaction of the City Engineer that the proposed system is <br />adequate, connects to an approved point of discharge, and meets <br />
The URL can be used to link to this page
Your browser does not support the video tag.