My WebLink
|
Help
|
About
|
Sign Out
PC-88- 93
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1988
>
PC-88- 93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:35:23 AM
Creation date
9/25/2007 11:08:33 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/10/1988
DOCUMENT NO
PC-88-93
DOCUMENT NAME
PUD-81-30-44D
NOTES
CALLAHAN PROPERTY COMPANY
NOTES 2
MAJOR MODICICATION TO AN APPROVED DEVELOPMENT PLAN
NOTES 3
7.8 ACRE SITE LOCATED ON W. ON WILLOWRD. OPPOSIE OF BAKER DRIVE AND WILLOW RD.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
46. That i! a sanitary sewer lift station is installed for use by <br />the development and i! it is accepted by the City for <br />maintenance and operation, an agreement shall be completed <br />between the City and the developer prior to the approval o! <br />the development to the effect that the developer will provide <br />a maintenance and operation lured for a minimum tan year <br />period. <br />47. That approval of the storm drainage system be withheld <br />pending final design and until the developer has demonstrated <br />to the satisfaction of the City Engineer that the system is <br />adequate, connects to an approved point o! discharge, meets <br />any and all applicable requirements o! the Alameda County <br />Flood Control District - Zone 7, meats any and all applicabl• <br />requirements of the Federal Emergency Management Flood Hazard <br />Program,.and meets the immediate and long-range requirements <br />of this development and all upstream areas intended to be <br />drained through this development. <br />48. That electric power distribution, ga• distribution, <br />communication service, and any required alarm systems be <br />installed underground in a joint utility trench unless <br />otherwise specifically approved by the City Engineer. <br />49. That the developer be responsible !or the installation o! the <br />street lighting system serving the development. The street <br />lights shall be 70 watt, high pressure sodium vapor units <br />mounted on galvanized steel poles with poured in place bases, <br />on the LS-iC schedule per City requirements and P.G.BE. <br />standard details unless otherwise apecitically approved. <br />Approval for the number, location, and type of electroliers <br />shall be withheld pending final design and review by the City <br />Engineer. <br />50. That this development provide a safe and effective <br />circulation system !or bicycles and pedestrians. These <br />facilities shall be designed and installed to the <br />satisfaction of the City Engineer and shall be separated from <br />vehicular traffic whenever possible. <br />51. That the developer submit detailed landscape and irrigation <br />plans as part of the improvement plans. These plans should <br />include, where applicable, a street tree planting plan and <br />landscape plans for medians, butler strips, and any <br />right-of-way landscape areas. The irrigation plan shall <br />provide !or automatic controls. <br />52. That any damage to street improvements now existing or done <br />during construction on the subject property be repaired to <br />the satisfaction of the City Engineer at full expense to the <br />developer. This shall include slurry seal, overlay, or <br />street reconstruction if deemed warranted by the City <br />Engineer. <br />Rev. 2/84 10/84 5/86 10/86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.