My WebLink
|
Help
|
About
|
Sign Out
RES 87433
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 10:04:01 AM
Creation date
12/7/1999 12:01:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/6/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LABORATORY TESTS <br /> <br /> (Unit charge for laboratory testing including the normal laboratory work and reporting of results <br /> only. Unusual or tim-consuming sample preparation or special tests are billed at hourly charge <br /> for the laboratory technician. Charges for testing which are not listed will be given upon <br /> request. Similarly, a reduction of the fee schedule rate can be given for a large number of <br /> tests). <br /> <br /> Billing Billing <br /> Rate/Test Rate/Test <br /> Classification Tests Strength Tests <br /> A6terberg Limits (PI & LL) . . . $ 85 Direct Shear (per point) ...... $ 30 <br /> Sieve Analysis ......... 65 Triaxial Compression <br /> Percent Passing #200 Sieve . . . 32 a. TX/UU .......... 85 <br /> Hydrometer Analysis ...... 78 b. TX/UU/S (backsaturated) . lq2 <br /> Sand Equivalent ........ 69 c. TX/CU .......... 153 <br /> Specific Gravity ........ 83 d. TX/CU/S ......... <br /> Bulk Specific Gravity ...... 72 (Add $50.00 for Pore <br /> Moisture Content/Unit Weight . 9 pressure reading) <br /> Compaction Curves e. TX/CD .......... 153 <br /> a. 4" mold ........ 130 Unconftned Compression ...... 55 <br /> b. 6" mold ........ 155 Consolidation Tests <br /> c. Cal Impact (wet) . . . 130 Consolidation Test ......... 130 <br /> d. Cal Impact (dry) . . . 155 Consolidation Test with time <br /> e. 1 Point Verification.. 55 compression curve plot .... 195 <br /> Durability Factor One point consol .......... 62 <br /> a. Fine ......... 123 Swell Test <br /> b. Coarse ........ 99 a. Undisturbed ....... 53 <br /> R-Value Tests b. Remolded ........ 103 <br /> Not requiring reproportioning.. 173 <br /> Requiring reproportioning .... 19~ Concrete Cylinders ......... 45/set <br /> Cement, lime, other ....... <br /> <br /> SPECIAL CONDITIONS <br /> <br />In the event that the Client requests termination of the work prior to completion of a report, we <br />reserve the right to complete such analyses and records as are necessary to place our files in <br />order and, where considered by us necessary to protect our professional reputation, to complete a <br />report on the work performed to date. A termination charge to cover the cost thereof in an amount <br />not to exceed 30 percent of all charges Incurred up to date of the stoppage of the work may, at <br />the discretion of BERLOGAR GEOTECHNICAL CONSULTANTS, be made. <br /> <br />All work including letters end reports prepared by BERLOGAR CEOTECHNICAL CONSULTANTS shall remain <br />the sole property of BERLOGAR GEOTECHNICAL CONSULTANTS until payment in full is received. <br /> <br /> LIMITATIONS <br /> <br /> BERLOGAR GEOTECHNICAL CONSULTANTS provides services in the field of <br /> Soil Engineering Engineering Geology, in accordance with presently <br /> accepted professional practices. No warranty, either expressed or <br /> implied, is granted as part of performance of our work. <br /> <br />For any damage on account of any error, omission or other professional negligence, our liability <br />will be limited to a sum of $50,000 or our fee, whichever is greater. <br /> <br />In the event the Client makes a claim against BERLOGAR GEOTECHNICAL CONSULTANTS at law or <br />otherwise, for any alleged error, omission or other acts arising out of the performance of our <br />professional services, and the Client fails to prove such claim, then the Client shall pay all <br />costs incurred by BERLOGAR GEOTECHNICAL CONSULTANTS in defending itself against the claim. <br /> <br /> BILLING <br /> <br />Invoices will be issued every month, payable upon receipt, unless otherwise agPeed..Client agrees <br />to pay on receipt all invoices not questioned within 10 days after mailing by BERLOGAR <br />GEOTECHNICAL CONSULTANTS. Any questions raised after- this lO-day period will be answered by <br />BERLOGAR GEOTECHNICAL CONSULTANTS and should any credit be due, BERLOCAR GEOTECHNICAL CONSULTANTS <br />will apply the credit to future Invoices, or tf requested by Client, refund any amount due. <br /> <br />A service charge of 2 percent per month (but not exceeding the maximum rate allowable by law) will <br />be payable on any amounts not paid within 30 days, payment thereafter to be applied first to <br />accrued interest and then to the principal unpaid amount. Any attorney's fees or other costs <br />incurred tn collecting any delinquent amount shall be paid by the Client. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.