Laserfiche WebLink
L a n d · c · l) · A r c h i t · c t u r · <br /> P I · n n i n 9 <br /> <br /> September 3, 1987 <br /> <br /> Partners <br /> Ronald Izurnita <br /> Roger McErlane <br /> Joseph Yee \ <br /> <br /> Frank grower <br /> Doris Brown Chandler Lee <br /> Todd 8ennitl <br /> w,,,,, F. Sch,U CITY OF PLEASANTON <br /> .. D..,. too.o-, 200 Bernal Avenue <br /> Thorhal H. Pritchett Pleasanton, CA 94566 <br /> Prsnc,pals: <br /> Robe. Sabbatini Dear Chandler.. <br /> Cal WaSarea <br /> <br /> I am pleased to submit our proposal for professional services regarding the <br /> landscape design standards for 1-580, Stoneridge, Gateway and El Charo Road. <br /> Haad Office This proposal is based on our existing knowledge of the specific plan area as <br /> 106 W. Fourth Street well as on my conversation with you on Tuesday, September 1st. <br /> Santa Aria <br />California 92701 <br />714/953-9443 We anticipate presenting all preliminary recommendations during the <br />cA Lic. 1196 September 17th meeting with the property owners. Following that meeting we <br />................ will submit a rough draft report by September 25th, and a final report within <br /> 5 days of receiving final comments. <br />Reg,onal OffH:es <br />Pallassist Building The proposed scope of work is as follows. <br />3780 Wilshire Boulevard <br /> Los Angeles <br /> C,lifor,i, 8oelo A. SCOPE OF WORK (Exhibit A) <br />213/383-5765 <br />................ ]. Prepare illustrative cross sections for each typical condition along <br /> Stoneridge Drive, Arroyo Macho, El Chard Road and 1-580, <br /> <br /> 444 DeHaro <br /> s,n F,,,,i,co 2. Propose recommended set back and open space conditions, including <br /> c,,fo,ni, 94107 sidewalks, landscape, grading, soundwalls or other noise attenuation <br /> 415/626-0893 recommendations, Arroyo Recreational Trail. <br /> <br /> 3. Prepare an overall plan illustratin8 the proposed character of each <br /> 1341 Plowman streetedge. <br /> Dallas <br /> Texas 75203 <br /> 214/946-4551 4. Develop schematic plans for two prototypical project entries. <br /> <br /> 5. Prepare recommendations for implementation, phasing and <br /> 821 Acoma Street maintenance. <br /> Denver <br /> Co,o,ado 80204 6. Review with property owners .on September 17. <br /> 303/571-1522 <br /> <br /> 7. Refine and finalize the studies based on discussion at the above <br /> meeting and prepare a rough draft report by September 25th. <br /> 1549 India Street <br /> Suite 314 <br /> San Diego <br /> California 92101 <br /> 619/232-2034 <br /> <br /> <br />